As a project administrator, you can configure scope item dates values for your project in Settings > Engineering > Dates tab.
When you set the Enable Scope Item Dates toggle to On, you must select from the three available options for dates. The Dates panel also shows for scope items.
Actual start dates are an aggregated value based on the claim date that you specify when you begin claiming. The Actual start date is based on the Dates settings shown in the following table:
| Setting | Description |
|---|---|
| Scope item | Generates one set of Planned, Current, and Actual Start and Finish Dates per scope item. The system captures the first claim date made on the scope item in the Actual Start Date field. |
| Scope item / Milestone | Generates one set of Planned, Current, and Actual Start and Finish Dates per unique milestone associated with the assigned claiming scheme. The system captures the first claim date made on each milestone on a claiming scheme in the Actual Start Date field. |
| Scope item / ScheduleGroup | Generates one set of Planned, Current, and Actual Start and Finish Dates per unique Scheduled Group associated with the assigned claiming scheme. The system captures the first claim date made on each schedule group on a claiming scheme in the Actual Start Date field. |
You must have Level 3 – Account Admin permissions in InEight Platform or a role with the applicable permissions in Engineering.
Scope item Dates values can only be updated when no dates are present on any scope item.