You can select which project values can be associated to engineering scope items and if they are required in a project. The values are configured at the organization level in Settings > Design > Engineering > Project values. Project values configured at the organization level are available in all projects.
To configure project values, go to Engineering > Project values.
When you include project values, those values are available for selection in Settings at the project level. You can select or deselect the values that are not required for the project.
When you require a project value, the value is required at the project level. The project-level toggles for these values are automatically disabled.
The selected project values are shown in the Scope item grid and slide-out panel. You can also export and import them in a Microsoft Excel spreadsheet.
You must have the Edit engineering settings permission.
After project values are set up, you can configure disciplines. For more information on how to configure disciplines, see Disciplines.