Resource types are associated with disciplines and must be managed in your project to add claiming schemes. For more information, see Configure claiming schemes. Resource types are created at the organization level.
You can manage resource types for your project in settings > Design > Engineering > Resource types.
You can do any of the following actions:
Add – Click the Select resource type drop-down list, select a resource type, and then click the Add resource icon.
Remove - Click the Remove resource type icon to the right. You cannot remove a resource type that has been assigned to a project.
Sort - Select a resource type, and then click the up and down arrows to the right of the table to adjust the position of the resource type.
All resource types are created at the organization level and are automatically inherited in projects. For more information, see Resource types in organization settings.
You must have Level 3 – Account Admin permissions in InEight Platform or a role with the applicable permissions in Engineering.
When you assign a resource type to a claiming scheme step, its associated ID and discipline is automatically populated.