You can map one to multiple documents to a scope item and map one to multiple scope items to a document. Use the toggle at the top right to switch between the two options.
You must have the required permissions in Engineering for document association.
Click Map many documents to a single scope item at the top right of the page.
Select a single scope item in the Scope items panel, and then select one to multiple documents in the Documents panel.
Click the Map document button in the Documents panel to complete the mappings. The green linked icon will show next to the scope item indicating that it has been mapped.
Click Map many scope items to single document at the top right of the page.
Select a single document in the Documents panel, and then select one to multiple scope items in the Scope items panel.
Click the Map scope item button in the Scope items panel to complete the mappings. The green linked icon will show next to the document indicating that it has been mapped.