The image and table below are a summary of the Mappings tab:
| Item | Description | |
|---|---|---|
| 1 | Scope Items grid | The left grid shows the project’s list of scope items. |
| 2 | Documents grid | The right grid shows the list of documents synced from Document. |
| 3 |
Map many documents to a single scope item
Map many scope items to single document |
Select to map many documents to a single scope item, or many scope items to a single document. |
| 4 |
Map scope item and Map document
Unlink scope items or documents |
After making your selection, you can map documents to a scope item or map scope items to a document.
After making your selection, unlink scope items or documents. |
| 5 | Auto hide mapped | Auto hide mapped scope items or documents to filter them out from the grid. |
| 6 | Search | Use to search scope items in the Scope items grid or search documents in the Documents grid. |
| 7 | Document sync | Sync existing, new, and updated documents from the Document application. Synced documents will show in the Associated documents page. The Last synced status is shown on the lower right side of the panel. |
| 8 | Mapped and unlinked items column |
View of mapped and unlinked items. Mapped items show a green mapped icon. Unlinked items show the Unlink icon. |
| 9 |
Document count
Scope item count |
In the Scope items grid, the Document count column shows the number of documents mapped to a scope item. In the Documents grid, the Scope item count shows the number of scope items mapped to the document. The number is a hyperlink you can click to open a dialog box that shows the list of associated items. |
When mapped documents are deleted in Document, a warning shows at the top of the page showing the number of documents that no longer exist.
You can click Remove mappings to view the deleted documents and remove.