Unlink associated items

You can unlink associated items from scope items and documents.

Considerations

You must have the required permissions in Engineering for document associations.

Steps

Unlink associated items

  1. To unlink documents from a scope item, select Map many documents to single scope item. To unlink scope items from a document, select Map may scope items to single document.

  2. Select the scope item or document.

  3. Click the Unlink icon. The Remove mapping dialog box shows.

  4. Select the item or items you want to unlink, and then click Confirm.