When integrated with InEight Document, a Document status column shows on the claiming scheme that syncs with the Document project.
The Document status field shows the synced status from the mapped project in Document. You can also click in the Document status field, and then click the drop-down icon to select an available status from the list.
Associate documents
Additional Information