You can define project-specific values to assign to scope items in the project. Types of project values are construction work areas, work classifications, and deliverable packages. You define the values for each of these. For example, a construction work area might be named Main St NE bridge, a work classification might be named Civil, and a deliverable package might be named Main St NE bridge access and laydown.
You can configure project values manually from the Scope items page or by importing a Microsoft Excel file.
To add a project value manually:
From the Scope items page, click Actions, and then select Configure project values from the drop-down menu. The Configure project values dialog box opens.
Click the type of project value you want to add (Construction work area, Work classification, or Deliverable package).
In the table, enter an ID and description for the project value.
You can also enter an activity code. Activity codes are optional to associate with project values, but they are used to run the Engineering Activity Report.
Click the Add icon.
Click Close.
Additional Information