Undo claiming

Undo claim wizard lets you undo claims for a step or scope item, which reduces the claiming back to 0% complete. This reverses all claims for the specific step or scope item to the day the original claim occurred.

All original claims and claim reversal are captured for audit purposes.

Considerations

  • You must have the permission Edit claiming.

  • You can undo claiming for a step or an entire scope item. See the steps below for more information.

  • When a step or scope item has not been claimed and is at 0%, the undo claiming icons do not show.

Steps

To undo claim for a step:

  1. On the Scope items page, click the Undo claim icon.

    A dialog box shows all claims for the step.

  2. Click Save to undo claiming for the steps shown.

To undo claim for a scope item:

  1. On the Scope items page, click the Undo claiming button at the bottom left.

    A dialog box shows claims for all the steps in the scope item.

  2. Click Save to undo claiming for the all the steps in the scope item.

When InEight Control integration is enabled, the undo claims are sent to the assigned WBS in Control.

Related links

You can also claim on scope items manually using the interface. For more information, see Claim on a scope item.