If you are using Design for engineering work, you could be collaborating with third party vendors, such as an Engineering firm, to design work on a project. As design work progresses, you might need vendors to participate in the review or development of the designs, and you can give them access to claim against the design steps they are working on.
In the Engineering module of Design, vendors can be given access to claim against the items they are participating in, known as engineering scope items.
To provide vendor access, all the following conditions must be met:
In Platform:
The vendor must be assigned to a user.
The vendor must be assigned to the applicable project.
The vendor must be assigned to a team in Project Settings > Design > Engineering.
In Design > Engineering:
The applicable scope items must be edited to assign the vendor team to the resources on the scope item.
After these conditions are met, the vendor can log into Design for the project they are assigned to. On the Scope items page of the Engineering module, the vendor can only view the scope items their team is assigned to.
For more information, see the following topics:
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information