Introduction to InEight Design
Welcome to InEight Design. This video demonstrates how to associate scope items with issues in Ineight Change.
Design's integration with change allows you to link existing issues from InEight Change with scope items, enhancing the change management process. This integration helps you identify which scope items have associated issues or change orders.
On the design engineering page, you'll find a new issue column when you expand it.
This column lets you associate an issue with one or multiple steps of a particular scope item.
Clicking on the issue hyperlink displays a list of issues configured within change. You can then assign an issue to a specific step or to the entire scope.
For example, let's assign an issue to all remaining steps in this scope. Click save to confirm.
Now, the issue is linked to multiple steps.
By selecting the number, you can see how many steps are associated with the issue and remove any step if needed.
You've now learned how to associate a step or scope item with an issue in innate change.
Thanks for watching.