General release is available starting 02-MAR-2026.
*Updated 26-FEB-2026
**Updated 19-MAR-2026
(Breaking change) SelfService_Estimate_ResourceCost – Fields in this API have been renamed.
ResourceCostsId has been renamed to EstimateResourceCostId
ResourceCostsUF has been renamed to EstimateResourceCostUF
EstimateResourceCostsUID has been renamed to EstimateResourceCostUID
(Breaking change) SelfService_Estimate_ResourceCostsReferencedData – This API has been renamed to SelfService_Estimate_ResourceCostReferencedData and fields in the API have been renamed.
Read more
(Breaking change) SelfService_Estimate_ResourceCostsCalculatedValue – This API has been renamed to SelfService_Estimate_ResourceCostCalculatedValue and fields in the API have been renamed.
Read more
(Breaking change) SelfService_Estimate_DependentCostItemFiltersCalculatedValue – Fields in this API have been renamed.
Read more
(Breaking change) SelfService_Estimate_DependentCostItemFiltersReferencedData – Fields in this API have been renamed.
DependentCostItemFiltersId has been renamed to EstimateDependentCostItemFiltersId
DependentCostItemFiltersUID has been renamed to EstimateDependentCostItemFiltersUID
(Breaking change) SelfService_Estimate_DependentCostItemFilter – Fields in this API have been renamed.
EstimateDependentCostItemFiltersId has been renamed to EstimateDependentCostItemFilterId
EstimateDependentCostItemFiltersUF has been renamed to EstimateDependentCostItemFilterUF
EstimateDependentCostItemFiltersUID has been renamed to EstimateDependentCostItemFilterUID
*(Breaking change in Release 26.3) InEight Contract precision change – The precision of all decimal data types will be updated to (28,15) or (38, 15) in the following Contract APIs:
Read more
**(Release 26.3) InEight Estimate API conversions - Currently, Estimate Explore and SelfService APIs report numeric values in the base currency or unit of measure. In Release 26.3 all fields that report amounts, quantities, or cost will be converted to match units of measure and currencies as shown in the Estimate (Cloud) user interface. The list of APIs and fields that are impacted is available in the Estimate View Changes document.
InEight Completions – These new SelfService APIs have been added for Completions:
Read more
InEight Compliance – These new SelfService APIs have been added for Compliance:
Read more
InEight Contract – These new SelfService APIs have been added for Contract:
Read more
InEight Estimate – These new SelfService APIs have been added for Estimate:
Read more
InEight Plan – These new Explore APIs have been added for Plan:
Explore_Plan_ClaimingSchemeStep
Explore_Plan_WBSClaimingSchemeAssociation
Explore_Plan_AccountCodeClaimingSchemeAssociation
InEight Platform – These new Explore APIs have been added for Platform:
Read more
InEight Report - A new Explore API for Explore_Report_EffectiveProjectPermission has been added for Report.
*SelfService_Contract_Contract – New fields for CreatedById, DefaultRetentionPercent, ContractRetentionPercent, Incoterm, and PaymentTerm have been added to this API.
SelfService_Core_AccountCode – The new field GeneralNotes has been added to this API.
SelfService_Design_Document – The string length has been changed in the API for these fields:
DocumentName is updated from 200 to 254.
DocumentNumber is updated from 100 to 200.
SelfService_Plan_QuantityClaim – New fields for UOMId and UOMName have been added to this API.
New fields in Platform APIs – New fields for SourceSystemId and SourceSystemName have been added to the following APIs:
Read more
*New fields in Schedule APIs – New fields for CreatedById, CreatedDate, ModifiedById, ModifiedDate, and IsActive have been added to the following APIs:
Read more
**(Breaking change in Release 26.3) Estimate dashboard deprecation – The Estimate dashboard will be deprecated in Release 26.3. The Estimate Portfolio dashboard that was published in Release 25.9 replaces the Estimate dashboard. As part of the dashboard deprecation, the permission View Estimate dashboard in InEight Platform will also be removed.
Change dashboard – The Change dashboard represents the life cycle of Issues, PCOs, CCOs, and VCOs, and allows you to track status, value and budget changes for your entire portfolio. This new dashboard was available to preview in Release 25.11 and is officially available in this release.
Read more
Project Controls dashboard – Updates have been made to the Project Controls dashboard that includes a new two-level hierarchy, a Cost Item Detail view, Health Check page enhancements, and a new Revenue Recognition view.
Read more
Estimate Portfolio dashboard – Enhancements have been made to the Benchmarking | 3 tab in this dashboard.
Read more
General release is available starting 29-DEC-2025.
*Updated 09-JAN-2026 **Updated 27-JAN-2026
(Breaking change) Explore_Core_Equipment and SelfService_Core_Equipment – As a result of changes to the product, the data in the EquipmentStatusId, EquipmentStatusName, and EquipmentStatusDescription fields show as null values in these APIs.
**(Breaking change) SelfService_Control_Budget – As a result of tool compatibility with parenthesis, these fields in the API have been renamed.
Read more
(Breaking change) SelfService_Design_QuantityItemNote and SelfService_Design_QuantityItemNoteTag – These APIs have been deactivated in this release and will be removed in a future release. Instead, the data in these APIs is available in these Design Quantity Item Observation APIs:
SelfService_Design_ElementObservation
SelfService_Design_Observation
SelfService_Design_QuantityItemObservation
InEight Design – These new Explore and SelfService APIs have been added for Design:
Read more
InEight Estimate – A new API, Selfservice_Estimate_WorkersCompValuesReferencedData has been added for Estimate.
InEight Plan – A new API, SelfService_Plan_DailyPlanClaimingStep, has been added for Plan.
*InEight Completions (Legacy) dynamic API - Due to database changes in the product, the float_answer field has been renamed to numeric_answer.
Explore_Contract_DetailTax – The new field, IncludeInCommittedCost, has been added to the API.
SelfService_Contract_CostItemPricingDetail – The new field, ValueTypeId, has been added to the API.
SelfService_Contract_ContractDocument – The new fields, VendorContractDocumentStatusId and IsVendorPortal, have been added to the API.
SelfService_Contract_PaymentClaim – The new field, ActualToDateCertified, has been added to the API.
SelfService_Contract_ContractDocument – The new field, VendorContractDocumentStatus, has been added to the API.
SelfService_Control_AuditLogImportHistoryRegister – The new field, TransactionId, has been added to the API.
Explore_Plan_WeeklyTimeSheet – The new field, ModifiedDate, has been added to the API.
SelfService_Plan_DailyPlanHoursResourceVersion – The following new fields have been added to the API:
Read more
Plan/Progress dashboard deprecation – The following dashboards for Plan and Progress have been deprecated in this release. The data from these dashboards is available in the Field Execution dashboard. Refer to the Transitioning to Field Execution Dashboard document to assist you in the transition from the legacy dashboards to the Field Execution dashboard.
Operations dashboard
Work Planning dashboard
Advanced Work Packaging dashboard
Material Tracking
(Preview) InEight Change dashboard – This dashboard is hidden but can be made available to preview. Go to organization > Settings > Explore > Dashboard Management and set the Visibility toggle to On for the Change Dashboard. The Change Dashboard represent the full lifecycle of Issues, PCOs, CCOs with portfolio and project level views.
Project Controls dashboard – All 15 project information tags and additional project level metrics, such as Active Employee Count and Project User Count, have been added to the dashboard’s dataset under the Project Attributes table.
Read more
SelfService_Contract_Contract – As a result of changes to the product, the format of the RemainingToBuy field is increasing from DECIMAL(16,5) to DECIMAL(21,5).
SelfService_Plan_Timecard – The pagination on this API has been updated to 20,000.
General release is available starting 27-OCT-2025.
*Updated 03-OCT-2025 **Updated 31-OCT-2025 ***Updated 11-NOV-2025 ****Updated 03-DEC-2025
(Breaking change) UnitOfMeasure field removed - The data in this field contains only null values and has been removed from the Explore_Control_CurrentBudget and SelfService_Control_CurrentBudget APIs.
(Breaking change) SelfService_Contract_CCODetail data type change - The data type for the RequestedExtensionDaysContract, RequestedExtensionDaysForecast, ApprovedExtensionDaysContract, and ApprovedExtensionDaysForecast fields have been changed from Integer to Decimal in this release.
(Breaking change) SelfService_Contract_CCOSummary data type change – The data type for the RequestedExtensionDays field has been changed from Integer to Decimal in this release.
(Breaking change) SelfService_Contract_IssueSummary data type change - The data type for the DelayDays field was changed from Integer to Decimal.
(Breaking change) SelfService_Contract_PCODetail data type change - The data type for the RequestedExtensionDaysContract, RequestedExtensionDaysForecast, ApprovedExtensionDaysContract, and ApprovedExtensionDaysForecast fields have been changed from Integer to Decimal.
**(Breaking change) SelfService_Control_Budget - To be consistent with naming convention standards, fields have been removed and new ones added to replace them in this API.
Read more
(Breaking change) InEight Plan APIs removed – These APIs: SelfService_Plan_ComponentConfiguration, SelfService_Plan_ComponentConfigurationValue, and SelfService_Plan_ProjectComponentPartialView have been removed in this release for Plan.
(Breaking change) SelfService_Schedule_ScheduleRegisterEventProbability – In this API the field ScheduleId can now have a null value.
****(Breaking change in Release 25.11) Explore_Core_Equipment and SelfService_Core_Equipment – As a result of changes to the product, the data in the EquipmentStatusId, EquipmentStatusName, and EquipmentStatusDescription fields will show as null values in these APIs in Release 25.11.
****(Breaking change in Release 25.11) SelfService_Design_QuantityItemNote and SelfService_Design_QuantityItemNoteTag – These APIs will be deactivated in Release 25.11 and removed in a future release. Instead, the data in these APIs is available in these Design Quantity Item Observation APIs:
SelfService_Design_ElementObservation
SelfService_Design_Observation
SelfService_Design_QuantityItemObservation
InEight Contract – A new API, SelfService_Contract_ChangeIssueCustomGroupElement has been added for Contract.
InEight Estimate – A new API, SelfService_Estimate_JobFolderTags has been added for Estimate.
InEight Schedule – The new APIs, SelfService_Schedule_ScheduleIntervalResource and SelfService_Schedule_SchedulePlanningPackageLogicLink have been added for Schedule.
SelfService_Billings_BillingsBatch – A new field for Description has been added to this API.
SelfService_Billings_BillingsLineItem – A new field for InvoiceNum has been added to this API.
SelfService_Contract_ContractDocument – New fields for IsPlaceholderDocument and PlaceHolderDocumentId have been added to this API.
SelfService_Contract_Detail – A new field for ContractId has been added to this API.
SelfService_Contract_PricingProposal – A new field for IsUnassignedItem has been added to this API.
SelfService_Contract_VendorChangeOrder – The Comments field has been added to this API.
Explore_Core_Employee and SelfService_Core_Employee - New fields for EmployeePIN, DefaultCostCenterSourceSystemId, and UnionSourceSystemId have been added to these APIs.
Selfservice_Core_ProjectEquipment – A new field for IsOverriddenRate has been added to this API.
SelfService_Core_Equipment – A new field for StandbyUnitCost has been added to this API.
SelfService Estimate APIs - All SelfService Estimate APIs that are suffixed with CalculatedValue or ReferenceData now include fields for the Base Table Primary Key (Id) and Unique Identifier (UID) if the API previously did not have them. This allows joining between the tables by the Primary Key.
Read more
Selfservice_Plan_Component – A new field for IsComplianceRequired has been added to this API.
Explore_Plan_Timecard and SelfService_Plan_Timecard – The following new fields have been added to these APIs.
Read more
**SelfService_Schedule_ScheduleRegisterEvent - A new field for ScheduleRegisterEventTypeId has been added to this API.
*Plan/Progress dashboard deprecation – The following dashboards for Plan and Progress will be deprecated in release 25.11. The data from these dashboards is available in the Field Execution dashboard. ***Refer to the Transitioning to Field Execution Dashboard document to assist you in the transition from the legacy dashboards to the Field Execution dashboard.
Operations dashboard
Work Planning dashboard
Advanced Work Packaging dashboard
Material Tracking
Estimate Portfolio dashboard – The Estimate Portfolio dashboard covers a wide range of InEight Estimate SaaS product features and functionalities. The dashboard provides an in depth, consolidated view of your entire estimate portfolio. This dashboard was available to preview in Release 25.7 and is officially available in this release. Some additional changes are included in this release.
Read more
Project Controls dashboard – The Unit Rate Comparison has been enhanced. For each of the five Unit Rate types (Cost/Mhr, Unit Cost, Unit Mhr, Qty/Mhr, and Labor Cost/Mhr) a dedicated comparison matrix now shows next to the scatter plots. This matrix shows the Current project's unit rate and the Lowest, Highest, and Average As Built values from the selected benchmark projects.
Read more
Field Execution dashboard – New fields have been added to the data model for this dashboard. Estimated Actual Cost (Overall)(Billing)(Emp), Estimated Actual Cost (Overall)(Billing)(Eqp), and Estimated Actual Cost (Overall)(Billing) have been added under the 2. Cost folder. Also in this folder, Employee Billing Rates for ST, OT, and DT were added, and Billing Class was added for employees and equipment.
SelfService_Compliance_GeneralHeaderData - The LastCompletedDate field has been added to the API and should be used in place of the FinishDate field.
General release is available starting 25-AUG-2025.
*Updated 22-SEP-2025
(Breaking change) SelfService_Contract_DocumentSignWorkflowHistory – The ExpireDateTime, DeliveredDateTime, and SignedDateTime fields have been deprecated in this release. In Release 25.1, data was removed from these fields. The following fields should be used instead: ExpireDate, DeliveredDate, and SignedDate.
(Breaking change) SelfService_Contract_PayFormPaymentRequest and SelfService_Contract_PaymentClaim APIs – The WorCompletedThroughDate field has been deprecated in these APIs. The WorkCompletedThroughDate field was added to these APIs in Release 25.5 to replace the WorCompletedThroughDate field.
(Breaking change) SelfService_Contract_CCOSummary – The ControlChangeRegisterID field has been converted to a decimal data type.
*(Breaking change) Explore_Control_CurrentBudget and SelfService_Control_CurrentBudget – Current Budget records are not assigned a unit of measure in the system, and the data in this table is incorrect. In this release, the data in the UnitOfMeasure column has been replaced with null values. In Release 25.9, the UnitOfMeasure column will be deleted.
(Breaking change) Explore_Design_EngineeringCBSManhourSpread API – The CEPlannedMHrs and CECurrentMHrs field values are null in this release. The fields remain in the API but were replaced by PlannedMHrs and CurrentMHrs in Release 25.5.
(Breaking change) Explore_Design_PlanScheduleActivity – For performance reasons, the primary key in this API has been changed to ComponentClaimingSchemeStepId in this release.
InEight Billings – The new APIs SelfService_Billings_BillingsProjectPayItem and SelfService_Billings_BillingsProjectWorkOrder have been added for Billings.
InEight Control – The new APIs Explore_Control_TimePhasedCostItem and SelfService_Control_TimePhasedCostItem have been added for Control.
SelfService_Billings_BillingsEquipment – A new field for BillingsProjectWorkOrderID has been added to this API.
SelfService_Billings_BillingsLabour – New fields for LocationCode and Billings ProjectWorkOrderID have been added to this API.
SelfService_Billings_BillingsLineItem – A new field for BillingsProjectWorkOrderID has been added to this API.
SelfService_Billings_BillingsMaterial – A new field for BillingsProjectWorkOrderID has been added to this API.
SelfService_Billings_BillingsProjectWBS – A new field for BillingsProjectPayItemID has been added to this API.
SelfService_Completion_GeneralHeaderData – New fields have been added to this API for the following:
Read more
SelfService_Compliance_GeneralHeaderData – New fields have been added to this API for the following:
Read more
SelfService_Contract_ChangeWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this API.
SelfService_Contract_ContractWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this API.
SelfService_Contract_Payform – The calculation for the DueDate field has been changed from first invoice date per payform + duedays, to minimum invoice date per payform + duedays. In addition, new fields for CreatedById, ModifiedById, and ModifiedByName have been added to this API.
SelfService_Control_ChangeOrder and Explore_Control_ChangeOrder – New fields have been added to these APIs for:
Read more
SelfService_Control_CostItemEstimatedResource – A new field for ProjectId has been added to this API.
SelfService_Core_UnitOfMeasure – A new field for IsActive has been added to this API.
SelfService_Core_User – New fields for CalculatedAsOfTimestamp and Email have been added to this API.
SelfService_Schedule_Schedule – A new field for CriticalActivityDuration has been added to this API.
SelfService_Schedule_ScheduleIntervalEvent – New fields for ActualUnits and RemainingUnits have been added to this API.
SelfService_Schedule_ScheduleIntervalStep – New fields for ActualUnits, AtCompleteUnits, and RemainingUnits have been added to this API.
SelfService_Schedule_ScheduleWorkBreakdownStructure – A new field for IsBottomUpCost has been added to this API.
CalculatedAsOfTimestamp – The CalculatedAsOfTimestamp field has been added to the following APIs:
Read more
(Breaking change) Deprecated dashboards – The Project Performance, Manhour Curves, and Control dashboards have been deprecated. The data from these dashboards can be found in the Project Controls dashboard. Refer to the Transitioning to Project Controls Dashboard document to assist in the transition from the legacy dashboards to the Project Controls dashboard.
(Preview) Estimate Portfolio dashboard – This dashboard is hidden but can be made available to preview in organization > Settings > Dashboard Management. The Estimate Portfolio dashboard covers a wide range of InEight Estimate SaaS product features and functionalities. The dashboard provides an in-depth, consolidated view of your entire estimate portfolio.
Project Controls dashboard – Enhancements have been made to the Project Controls dashboard that include operational benchmarking, CCO/Issue description, earned cost and gain/loss metrics, and notes for cost items.
Read more
(Breaking change) Decimal precision changed in Contract APIs - As a result of changes from the source product databases, fields in the following APIs have been updated from decimal (16,5) to (21,5).
Read more
General release is available starting 23-JUN-2025.
*Updated 22-JUL-2025
(Breaking change) Fields removed in InEight Estimate APIs – Fields in the following APIs have been removed in the source database and no longer report data through the SelfService APIs. The fields remain in the data contract but do not populate with any data.
Read more
(Breaking change in Release 25.7) Explore_Design_EngineeringCBSManhourSpread API - Two fields, PlannedMHrs and CurrentMHrs, have been added to the API in Release 25.5 to replace the existing CEPlannedMHrs and CECurrentMHrs fields. In Release 25.7, the CEPlannedMHrs and CECurrentMHrs fields will remain in the API but the values will be null.
(Breaking change in Release 25.7) SelfService_Contract_PayFormPaymentRequest and SelfService_Contract_PaymentClaim APIs - The WorkCompletedThroughDate field has been added to the APIs in Release 25.5 to replace the WorCompletedThroughDate field. In Release 25.7, the WorCompletedThroughDate field will be deprecated in the APIs.
*(Breaking change in Release 25.7) Explore_Design_PlanScheduleActivity - For performance reasons, in Release 25.7 the primary key on this API will be changed to ComponentClaimingSchemeStepId.
*(Notification of removal in Release 25.7) SelfService_Contract_DocumentSignWorkflowHistory - Data was removed from the ExpireDateTime, DeliveredDateTime, and SignedDateTime fields in Release 25.1. In Release 25.7, these fields will be removed. The following fields should be used instead: ExpireDate, DeliveredDate, and SignedDate.
*(Notification of change in Release 25.7) SelfService_Control_CurrentBudget - Current Budget records are not assigned a unit of measure in the system and the data in this table was incorrect. The data in this column will be replaced with null values in Release 25.7, and the field will be removed in Release 25.9.
*(Notification of data type change in Release 25.7) SelfService_Contract_CCOSummary - The ControlChangeRegisterID field will be converted to a decimal data type in Release 25.7.
Deprecated InEight Plan APIs – The SelfService_Plan_ComponentConfiguration, SelfService_Plan_ComponentConfigurationValue, and SelfService_Plan_ProjectComponentPartialView APIs have been removed due to the consumption of Project Structures/Project Values data in Plan and have been deprecated in this release. For the new data, refer to the SelfService_Plan_ComponentCustomGroupElement API.
Deprecated legacy InEight Schedule APIs – These legacy Schedule APIs have been blank since Release 23.6 when the Schedule platform was migrated and have been deprecated in this release.
Read more
InEight Contract APIs - The new SelfService APIs, SelfService_Contract_ChangeStatusHistory and SelfService_Contract_ContractDetailManualAdjustment have been added for Contract.
InEight Platform APIs – The new SelfService APIs, SelfService_Core_OrganizationBridge and SelfService_Core_Role have been added for Platform.
InEight Estimate APIs updated fields – The fields in the following Estimate APIs have been updated to calculate quantity based on the UOM factor.
Read more
SelfService_Control_ActualCost – For performance reasons the paging size of this API has been changed to 50,000.
*SelfService_Control_ChangeOrder - New fields for ApprovalProbability, RevenueChangeStatusId, and RevenueChangeStatusName have been added to the API.
Explore_Core_ProjectUserRole – The new field IsOrganzationLevel has been added to the API.
Explore_Core_RoleAction – The new field Blade was added to the API to indicate the associated permissions blade in the Roles and Permissions interface.
(Breaking change in Release 25.7) Dashboards to be deprecated – In Release 25.7, the Project Performance, Manhour Curves, and Control dashboards will be deprecated. The data from these dashboards can be found in the Project Controls dashboard. Refer to the Transitioning to Project Controls Dashboard document to assist in the transition from the legacy dashboards to the Project Controls dashboard.
Project Controls dashboard - Enhancements have been made to the Project Controls dashboard Health Check tab that include additional health metrics and a toggle that lets you view analysis for all projects, and additional views have been added to the Change Details tab. A new Committed cost calculation has also been added to the semantic model.
Read more
Schedule dashboard – On the Activity Comparison tab, drillthrough capability has been added for further analysis of activity count metrics.
Read more
Connected Analytics Index dashboard – Pagination information has been added to the API tab and the dashboard has been updated with the latest InEight branding.
Field Execution dashboard – OBS has been incorporated into the dashboard, which is now visible in the slicer.
General release is available starting 21-APR-2025.
Updated 28-APR-2025
(Breaking change) Field type change in InEight Contract/Change APIs – To standardize the data types of date fields, the field type of the CreatedDate field has been changed from DateTime to DateTimeOffset in the SelfService_Contract_CCOSummary and SelfService_Contract_PCOSummary APIs.
(Breaking change) Field type change in InEight Compliance and InEight Completions APIs - To improve performance, the field type of the InspectActivityResponseId field has been changed from NVARCHAR to BigInt in the SelfService_Compliance_CurrentEventTaskData and SelfService_Completion_CurrentEventTaskData APIs.
(Breaking change in Release 25.5) Fields removed in InEight Estimate APIs - Fields in the following APIs will be removed in the source database and will no longer report data through the SelfService APIs. The fields will remain in the data contract but will not populate with any data.
Read more
(Release 25.5) Deprecated InEight Plan APIs - The SelfService_Plan_ComponentConfiguration, SelfService_Plan_ComponentConfigurationValue, and SelfService_Plan_ProjectComponentPartialView APIs no longer report any data due to the consumption of Project Structures/Project Values data in Plan and will be deprecated in Release 25.5. For the new data, refer to the SelfService_Plan_ComponentCustomGroupElement API.
PrimaryKey fields name change in InEight Estimate API – The PrimaryKey (PK) fields in the SelfService_Estimate_ResourceCostsCalculatedValue API have been changed from ResourceCostsCalculatedValuesId and ResourceCostsCalculatedValuesUF to EstimateResourceCostsCalculatedValuesId and EstimateResourceCostsCalculatedValuesUF.
Field length change in InEight Design API - To improve performance, the PrimaryKey field EngineeringCBSManhourSpreadId string length in the Explore_Design_EngineeringCBSManhourSpread API has been changed to 100.
InEight Completions APIs – The new SelfService APIs, SelfService_Completions_EventTaskDataDaily and SelfService_Completions_GeneralHeaderDataDaily have been added for Completions.
InEight Compliance APIs – The new SelfService APIs, SelfService_Compliance_EventTaskDataDaily and SelfService_Compliance_GeneralHeaderDataDaily have been added for Compliance.
InEight Contract APIs – The following new SelfService APIs have been added for Contract:
Read more
InEight Platform API – The new SelfService API SelfService_Core_ProjectFuelType has been added for Platform.
Paging size change in InEight Estimate APIs – The paging size has been standardized for all Estimate APIs and is now set to 10,000.
SelfService_Billings_BillingsRateItemUnit – The new fields CreatedById, CreatedDate, ModifiedById, and ModifiedDate have been added to the API.
SelfService_Completion_OBSData – The new field OrganizationName has been added to the API.
SelfService_Contract_ContractDocument – The new field TaxVerificationNumber has been added to the API.
SelfService_Contract_DiversityCategory – The new field Percentage has been added to the API and the string length of the Value fields has been increased from 50 to 500.
SelfService_Contract_IssueSummary – The new field ChangeIssueSource has been added to the API.
SelfService_Contract_PackageDocument – The new field TaxVerificationNumber has been added to the API.
Explore_Control_ControlChangeOrderTimePhasedBudgetDetail – The new field ControlFiscalYearAccountingPeriodId has been added to the API.
SelfService_Control_CostItem – The new field UnitOfMeasureName has been added to the API.
SelfService_Control_ControlChangeOrderTimePhasedBudgetDetail – The new field ControlFiscalYearAccountingPeriodId has been added to the API.
SelfService_Core_ProjectEmployeeBillingClass – The new field IsAvailable has been added to the API.
SelfService_Core_ProjectEquipmentBillingClass – The new field IsAvailable has been added to the API.
Explore_Design_EngineeringCBSManhourSpread – The new fields PlannedMhrs and CurrentMhrs have been added to the API.
SelfService_Design_ClaimingScheme – The new field IsAvailable has been added to the API.
SelfService_Design_DesignQuantityItemComponent – The new field IsAssociated has been added to the API.
SelfService_Design_DeliverablePackageSummary – The new field PlannedMhrs has been added to the API.
SelfService_Design_EngineeringDocumentSummary – The new field PlannedMhrs has been added to the API.
SelfService_Design_EngineeringWorkPackageSummary – The new field PlannedMhrs has been added to the API.
SelfService_Design_ScopeItem – The new field IsScopeLocked has been added to the API.
Project Controls dashboard – Enhancements have been made to the Project Controls dashboard that include tracking of cost at parent levels and the addition of a new Change Details page.
Read more
Schedule dashboard - The Schedule dashboard has been updated to be consistent with the standard page layout, branding, and navigation found in other dashboards, such as Project Controls and Field Execution.
Read more
General release is available starting 17-FEB-2025.
Updated 24-FEB-2025
InEight Estimate APIs deprecated fields – In the following Estimate APIs, the listed fields no longer provide updated data and have been deprecated. The data in these fields is currently available in InEight Platform APIs.
Read more
InEight Plan Project Structures/Project Values - The Plan APIs SelfService_Plan_ComponentConfiguration, SelfService_Plan_ComponentConfigurationValue, and SelfService_Plan_ProjectComponentPartialView no longer report any data due to the consumption of Project Structures/Project Values data in Plan and will be deprecated in Release 25.5. For the new data, refer to the SelfService_Plan_ComponentCustomGroupElement API.
InEight Contract and InEight Change UTC field format – Updates have been made to standardize the data types of date fields in Contract and Change APIs.
Read more
InEight Billings APIs – The following APIs have been added for Billings. This is the first release of Billings data in Connected Analytics.
Read more
InEight Contract API – The new SelfService API, SelfService_Contract_BidPackageNote, has been added for Contract.
InEight Control APIs – The following new Explore and SelfService APIs have been added for Control.
Read more
InEight Estimate APIs – The following new Explore APIs have been added for Estimate.
Read more
SelfService_Contract_Contract – The new fields, PublishRequestStatus and IsPublished have been added to the API.
SelfService_Contract_CostItemPricingDetail – The new field, ContractChangeOrderId, has been added to the API.
SelfService_Contract_PackageDocument – The length of the ExecutedDate field has been increased from 50 to 250.
SelfService_Contract_PayFormPaymentRequest – The name of the WorkCompletedThroughDate field has been corrected in the API.
SelfService_Contract_PaymentClaim – Corrected name of the WorkCompletedThroughDate field in the API.
SelfService_Control_CostItem – The new field, UnitOfMeasureName, has been added to the API.
SelfService_Core_ProjectRateCode – The new field, IsAvailable, has been added in the API.
SelfService_Core_UnitOfMeasure – The new field, IsAvailable, has been added in the API.
SelfService_Design_ScopeItemQuantityClaimDetail – The new field, ClaimingSchemeStepId, has been added to the API.
Project Controls dashboard view – A new view has been added to the Revenue Snapshot page that allows users to compare historical snapshots across multiple metrics that includes Billed Revenue, Actual Cost, Current Price and Forecast Revenue, and Current and Forecast Margin Percentages.
Read more
Breaking change in InEight Contract APIs - In Release 25.3, the field type of the CreatedDate field will change from DateTime to DateTimeOffset in the SelfService_Contract_CCOSummary and SelfService_Contract_PCOSummary APIs.
Breaking change in InEight Compliance and InEight Completions APIs - In Release 25.3 to improve performance, the field type of the InspectActivityResponseId field will change from NVARCHAR to BigInt in the SelfService_Compliance_CurrentEventTaskData and SelfService_Completion_CurrentEventTaskData APIs.
General release is available starting 09-DEC-2024.
(Release 25.1) InEight Estimate APIs deprecated fields - Starting in Release 25.1, the following fields in the corresponding Estimate APIs will no longer provide updated data and will be deprecated.
Read more
(Release 25.1) InEight Contract and InEight Change UTC field format – In Release 25.1, updates will be made to standardize the data types of date fields in Contract and Change APIs, which allows for easier conversion to specific time zones.
InEight Plan Project Structures/Project Values - In this release, the following Plan APIs are currently populated with stale data because of the consumption of Project Structures/Project Values data in Plan.
Read more
InEight Contract APIs – A new SelfService API, SelfService_Contract_SettingValue, and a new Explore API, Explore_Contract_SettingValue, have been added for Contract.
InEight Design APIs – New SelfService APIs, SelfService_Design_EngineeringDocumentSummary and SelfService_Design_ScopeItemClaimingStepDetailChangeIssue, have been added for Design.
InEight Estimate APIs – New SelfService APIs have been added for Estimate.
Read more
InEight Plan API – A new SelfService API (SelfService_Plan_QuantityTrackingITP) has been added for Plan.
InEight Report API – A new Explore API (Explore_Report_EffectiveProjectPermissions) has been added for Report.
InEight Schedule API – A new SelfService API (SelfService_Schedule_ScheduleSnapshot) has been added for Schedule.
SelfService_Contract_PaymentRequest – The new field, IsExternalPaymentRequest, has been added in the API.
SelfService_Contract_ScheduleOfValue - The new field, IsAvailable, has been added in the API.
SelfService_Schedule_Schedule – The following new fields have been added in the API.
Read more
SelfService_Schedule_ScheduleActivity – These new fields have been added in the API: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
SelfService_Schedule_ScheduleType – These new fields have been added in the API: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
SelfService_Schedule_ScheduleWorkBreakdownStructure – These new fields have been added in the API: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
Custom cost category names – The APIs, Explore_Control_ChangeOrderCost, SelfService_Control_BilledRevenueDetail, and Selfservice_Control_ChangeOrderCost, have been updated to show custom cost category names.
Project Controls dashboard rebranding and updates – Enhancements have been made to the Project Controls dashboard pages that include rebranding with new InEight logos, colors, and fonts.
Read more
General release is available starting 07-OCT-2024.
Updated 13-NOV-2024
InEight Plan Project Structures/Project Values - In this release, data in the following APIs will no longer refresh because of the consumption of Project Structures/Project Values data in Plan. For the new data, reference the SelfService_Plan_ComponentCustomGroupElement view.
Read more
SelfService_Control_PersonalForecast – Due to performance issues, starting in this release the SelfService_Control_PersonalForecast API will not report data and has been replaced with the new Explore_Control_PersonalForecast API. To meet performance expectations, the number of records the API returns has been reduced to include only active records available in the user interface. The SelfService API will be deprecated in a future release.
SelfService_Control_PayItem API - In this release, for performance reasons multiple fields have been removed from the SelfService_Control_PayItem API and are instead available in the new SelfService_Control_PayItemExtended API. The affected fields return null values in the SelfService_Control_PayItem API and report the actual values in the SelfService_Control_PayItemExtended API.
Read more
Deprecated fields and breaking changes – Changes to the SelfService_Plan_Component API fields in this release include renamed, new, and deprecated fields, as shown in the table.
Read more
Logic update for active records – Corrective updates have been made to the logic that determines active records in the database. If you notice abnormalities in data that you are capturing via an ETL process in the APIs listed, do a full table refresh to truncate and load the data, rather than a delta or incremental update.
Read more
API Generator forms – When you create or edit an API, the Form selector now includes an information icon for each form, which shows the organizations and projects associated with the form.
Read more
Dashboard user data refresh – A new option has been added to Dashboard Management in organization > Settings > Explore that lets administrators refresh the user data in the background if new users need access to in-app dashboards.
Read more
Field Execution dashboard – The new Field Execution dashboard features data from InEight Plan and InEight Progress that lets you analyze performance and productivity metrics.
Connected Analytics Index dashboard – The new Connected Analytics Index dashboard provides a catalog of all reporting items contained in Report, Explore and Replicate. The dashboard also provides updated schema information for each Explore and SelfService API and Replicate view when your environment upgrades to a new release.
InEight Contract APIs – New SelfService APIs and an Explore API have been added for Contract.
Read more
InEight Control APIs – New SelfService APIs have been added for Control.
Read more
InEight Design APIs – New SelfService APIs and Explore APIs have been added for Design.
Read more
InEight Plan APIs – A new SelfService API and Explore APIs have been added for Plan.
Read more
InEight Platform APIs – New SelfService APIs have been added for Platform.
Read more
SelfService_Contract_ChangeWorkflow - New fields have been added for StepNumber, Recipient, and Approvers in the API.
SelfService_Control_PayItem - A new field has been added for IsTerminal in the API.
SelfService_Core_Project – New fields have been added to the SelfService_Core_Project API.
Read more
SelfService_Plan_PlanNote – The new field WorkPlanId has been added to the API to enable joining to the WorkPackageConstraintManagement API.
SelfService_Plan_WorkPackageContraintManagement – The new field WorkPlanConstraintStatus has been added to the API.
General release is available starting 05-AUG-2024.
Updated 14-AUG-2024
API Enhancements – New fields were added to the following APIs.
Read more
API Deprecations – The following APIs have been deprecated in Release 24.7 as these APIs/fields represent unused table structures.
Read more
InEight Contract APIs – New SelfService APIs and an Explore API have been added for Contract.
Read more
InEight Design APIs – New SelfService APIs have been added for Design.
Read more
InEight Estimate APIs – New SelfService APIs have been added for Estimate.
Read more
InEight Plan APIs – New SelfService APIs have been added for Plan.
Read more
SelfService_Core_Project – New SelfService Schedule APIs have been added for Core.
Read more
Compliance/Completion Event Task APIs - A data type change has been made to all responses for date characteristic types and are now converted from MM/DD/YYYY to the ISO 8601 format YYYY-MM-DD, which includes button push timestamps. The conversion only occurs in the Response field and the RawResponse fields are not affected.
Read more
SelfService_Core_DocumentApplicationIntegration - A data type change has been made to the IsActive field. The field data type was set to an Integer but has been changed to a Bit.
Release 24.9 Deprecated fields – Starting with Release 24.9, multiple changes that includes deprecating fields will occur in the SelfService_Plan_Component Explore API.
Read more
SelfService_Plan_ComponentCharacteristic field changes - Due to changes in the source system, data from the ComponentCharacteristicTypeId and ComponentCharacteristicListItemId fields in the API have migrated to the new fields CustomCharacteristicTypeId and CustomCharacteristicTypeElementId, respectively.
Field Execution dashboard (preview) - A new Field Execution dashboard is now available for preview. The dashboard has been deployed in Release 24.7 with the Visibility toggle set to Off, which can be changed to On in organization > Settings > Explore.
Read more
General release is available starting 03-JUN-2024.
API Enhancements – New fields were added to the following APIs.
Read more
API Deprecations/Changes – The following APIs from Estimate SaaS will be deprecated as they are not reporting any data. These changes will be made in the 24.7 release.
Read more
Compliance/Completion Event Task Data type change – All responses for date characteristic types will be converted from MM/DD/YYYY to the ISO 8601 format YYYY-MM-DD, this will include button push timestamps. This will only occur in the Response field.
Read more
InEight Contract APIs – New SelfService APIs and an Explore API have been added for Contract.
Read more
InEight Control APIs – A new SelfService_Control_ProjectCashFlow API has been added for Control.
InEight Design APIs – A new SelfService_Design_QuantityItemCustomGroupElement and SelfService_Design_LinkedEngineeringProject have been added for Design.
InEight Plan API – New SelfService APIs have been added for Plan.
Read more
SelfService_Core_Project – The new SelfService_Core_CostCategory has been added to this API.
InEight Compliance APIs – New SelfService APIs have been added for Compliance.
Read more
InEight Completions APIs – New SelfService APIs have been added for Completions.
Read more
InEight Control APIs – A new SelfService_Control_SchedulerDetail API has been added for Control.
InEight Estimate APIs – New SelfService APIs have been added for Estimate (cloud).
Read more
InEight Plan API – The SelfService_Plan_TimeCardIntegrationStatus API has been added for Plan.
InEight Platform APIs – New SelfService APIs have been added for Platform.
Read more
SelfService_Contract_Contract – The ContributedAmount field has been added to the SelfService_Contract_Contract API.
SelfService_Contract_IssueSummary – The CreatedBy field has been added to the SelfService_Contract_IssueSummary API.
InEight Schedule dashboard – A new dashboard is available that exposes data from Schedule. The dashboard allows for deep analysis of Mitigation, Risk, Float and much more.
Read more
Updated 18-Jan-2024
SelfService_Control_ScheduleDetail - To consume changes made in InEight Control, the CreatedDate and ModifiedDate fields in the SelfService_Control_ScheduleDetail API have been converted to a date-time offset data type.
Depricated APIs – The SelfService_Change_History and SelfService_Contract_ChangeStatusHistory APIs have been deprecated in this release.
InEight Estimate APIs – The following new APIs report only active records and data that is shown in the UI. These APIs are intended for business intelligence use cases, such as Power BI reporting, and they do not report any previous versions of the data.
Read more
InEight Control API – A new Control API has been added in this release for SelfService_Control_CostItemAssignedVendor.
InEight Contract API – The Notes field has been added to the SelfService_Contract_ContractCloseOut API.
New Explore permission – The permission View shared dashboards and embedded content only has been added, which hides all standard dashboards and limits the list of dashboards and embedded content a user can see to only those that have been shared with them. The permission does not limit dashboards and embedded content shared with the user assigned to the project or organization. It also hides all standard InEight dashboards . For more information, see Permissions
Updated on 6-Dec-2023
API Deprecations/Changes - Data type change in 23.12 to the SelfService_Control_ScheduleDetail API, to consume changes made in the Control application, in 23.12 the CreatedDate and ModifiedDate fields will be converted to a DATETIMEOFFSET
The following APIs will be deprecated in the 23.12 release.
Read more
InEight Schedule APIs – New SelfService Schedule APIs have been added for Schedule.
Read more
InEight Completions APIs – New Completions APIs have been added in this release for SelfService_Completion_GeneralHeaderData UserID
InEight Compliance APIs – New Compliance APIs have been added in this release for SelfService_Compliance_GeneralHeaderData UserID
InEight Contract API – New SelfService Schedule APIs have been added for Contract.
Read more
InEight Estimate APIs – The following new SelfService APIs have been added for Estimate.
Read more
SelfService_Core_Project – New SelfService Schedule APIs have been added for Core.
Read more
Updated 10-OCT-2023
InEight Schedule APIs – New SelfService Schedule APIs have been added for Schedule.
Read more
InEight Completions APIs – New Completions APIs have been added in this release for SelfService_Completion_ScheduledEventTaskData, Explore_Completion_CurrentEventTaskData, Explore_Completion_FormsandProject, Explore_Completion_ScheduledTaskData.
InEight Compliance APIs – New Compliance APIs have been added in this release for SelfService_Compliance_ScheduledEventTaskData, Explore_Compliance_CurrentEventTaskData, Explore_Compliance_FormsandProject, and Explore_Compliance_ScheduledTaskData.
InEight Contract API – A new Contract API has been added in this release for SelfService_Contract_InvoiceLineItem.
InEight Control APIs – New Control APIs have been added in this release for SelfService_Control_CorporateForecastCostDetail and Explore_Control_CorporateForecastCostDetail.
InEight Platform APIs – New Platform APIs have been added in this release for SelfService_Core_ProjectAssignedContact, SelfService_Core_ProjectCraftRateCode, SelfService_Core_ProjectRateCode, and SelfService_Core_ProjectEquipmentOperationalRateCode.
SelfService_Core_Project – The new field ExternalProjectId has been added to this API.
InEight Model dashboard – A new Tracked Issue dashboard that shows information about issue management for Model has been added to Explore.
Updated 07-AUG-2023
API Generator – Enhancements have been made to the API Generator on the API builder page that let you search in the Forms drop-down list, and preview the API before saving it.
SelfService_Control_CurretProjectForecastDetail – The fields Is_Active and Modified_Date have been renamed to IsActive and ModifiedDate to adhere with standard API naming conventions, and the PlugColumnName field has been added to this API.
InEight Schedule APIs – The following set of new Schedule APIs have been added in this release that need to be used in place the existing APIs when your Schedule platform is migrated to the InEight cloud platform. Data that was available from the deprecated APIs will be migrated to the new APIs. These new APIs will refresh once per day.
Read more
Deprecated InEight Schedule APIs – The following APIs will no longer report any data after your Schedule platform has been migrated. These APIs will be available in APIM, but they will not return any data and will be removed from APIM in a future release. All existing data will be migrated to the new APIs.
Read more
InEight Estimate APIs – The following new SelfService APIs have been added for Estimate (cloud).
Read more
SelfSerice_Estimate_Contact API - The contact information will now be sourced from InEight Platform, which can be found in the SelfService_Core_Contact API and will therefore be deprecated in the SelfSerice_Estimate_Contact API in a future release. The following fields will return null values in the SelfService_Estimate_Contact API.
Read more
SelfService_Contract_DetailCostItem – This new API has been added for InEight Contract.
SelfService_Report_DateProject – This new API has been added for InEight Report.
InEight Contract APIs – The following APIs have been modified for Contract.
Read more
SelfService_Control_CostItem – The RowNumber field has been added to this API.
SelfService_Core_ProjectEmployee – The ProjectEmployeeBillingClassId, ProjectRateCodeId, and CustomField1 fields have been added to this API.
SelfService_Estimate_JobReferencedData – The ProjectDisplay and OrganizationDisplay fields have been added to this API. These fields populate with the values from Platform if the Estimate job has been connected to a project.
SelfService_Plan_WorkPackage – The ProjectDisplay field has been added to this API.
SelfService_Core_ProjectEmployeeVersion – With the additions to the SelfService_Core_ProjectEmployee, this API is now redundant as they both report the same data and columns. The fields in the SelfService_Core_ProjectEmployeeVersion API will return null values and the API will be removed in a future release.
Release 23.8 Deprecated APIs – Starting in Release 23.8, the SelfService_Compliance_UserAssignment and SelfService_Completion_UserAssignment APIs will be deprecated and no longer report data.
InEight Control API – The SelfService_Control_PersonalForecast API was added. This API expose data from the Private forecasts in Control for analysis purposes before pushing changes to the Live forecast.
InEight Contract API – The SelfService_Contract_VendorChangeOrderLineItem API was added. This API includes data from Contracts > Vendor Change Order Log > Line Items.
InEight Estimate APIs – The following SelfService APIs have been added for Estimate (Cloud).
Read more
Updated InEight Control API – The Project Id and Forecast Date fields have been added to the SelfService_Control_CurrentProjectForecastDetail.
Updated InEight Contract API – The DocuSign Status, Sent By, and Company fields from the DocuSign integration have been added to SelfService_Contract_DocumentSignWorkflowHistory.
Updated InEight Completions API – The Is Active field has been added to the SelfService_Completions_UserAssignment API to indicate records that have been soft-deleted.
Updated InEight Compliance API – The Is Active field has been added to the SelfService_Compliance_UserAssignment API to indicate records that have been soft-deleted.
Deprecated APIs – The following Estimate Sync Tool APIs for Estimate (on premise) are not in use and will be deprecated in Release 23.4.
Read more
Dashboard enhancements – Commitment data from Control and CBS tags have been added to the dataset in the Project Performance dashboard and Portfolio dashboard for use in visualizations.
API generator for InEight Compliance and InEight Completions – The API generator lets you create a reportable OData API that is based on security and permissions in InEight applications, and for the individual fields that you are interested in using for reporting from Compliance and Completions (does not include Legacy Completions). In the Main menu, go to Explore > API generator, which shows a list of APIs you created and APIs shared with you. You must have the Explore permission View API generator to see it in the Main menu.
Read more
Updated 21-APR-2023
InEight Estimate APIs – The following new SelfService APIs have been added for Estimate.
Read more
InEight Control APIs – The following new SelfService APIs have been added for Control.
Read more
InEight Completions APIs – APIs have been added for the new Completions product.
Read more
Updated InEight Control API – The Project Id and Forecast Date fields have been added to the SelfService_Control_CorporateForecastDetail API.
InEight Completions permission – In View Reporting APIs, the new permission View Completions web APIs was added, and the permission View Completions APIs was renamed to View legacy Completions APIs.
Deprecated dashboard – The InEight Compliance Forms dashboard has been deprecated in this release due to lack of utilization.
Deprecated APIs – The SelfeService Plan_DailyPlanHours and SelfService_Control_CostItmeActual APIs have been deprecated in this release.
Updated InEight Control dashboard – Enhancements have been made to the Control dashboard.
Read more
Explore permissions restructure – The Dashboards permissions for Explore have been updated for clarity and to be more intuitive. Existing roles are automatically reconfigured when upgraded to Release 23.2.
Read more
Decimal precision – Breaking Change As a result of architectural changes the following APIs/Replicate views and fields have been adjusted to a decimal precision of (28,15). This will not impact Power BI dashboards, but it will impact any ETL operations.
SelfService_Plan_Component: ComponentQuantity, ToDateQuantity, PercentageComplete
SelfService_Plan_QuantityClaim: Claimed_Quantity
SelfService_Plan_QuantityClaimDetail: ComponentIncrementQuantity, ComponentTotalQuantity, InstallQuantity, ComponentQuantityHistory, StepQuantityHistory, StepQuantity
Explore_Plan_WorkPlanCostItem: Quantity
Data type change in SelfService_Core_UserProject Currently, the Project_ID field in the API reports the Project Display field in the UI. This field in the API has been remapped to the internal project ID and the data type has been updated to a bigint. A new field ProjectDisplay has been added to report the project display ID with a data type of nvarchar (200).
Document reporting APIs – The first set of Document reporting APIs are now available for the Document, Mail, Forms, Packages, and Transmittals modules.
New permission – The View Document APIs permission has been added to Explore > Reporting APIs in InEight Platform.
Deprecate Compliance Forms dashboard – In Release 23.2, the Compliance Forms dashboard will be deprecated due to lack of utilization.
CustomList1Value and CustomList2Value – The SelfService_Contract_IssueDetail, SelfService_Contract_PCODetail, and SelfService_Contract_CCODetail APIs now include text values associated to these IDs for the custom list selections.
SelfService_Contract_PayForm – The Comments field contents from the Contract > Payment Form > Details page are now included in this API.
InEight Plan Timecard Notes APIs – Two new APIs, Explore_Plan_TimeCardNote and SelfService_Plan_TimeCardNote, have been added to expose notes from timecards.
SelfService_Contract_InvoicePayment – These new fields have been added to the SelfService_Contract_InvoicePayment: PostingDate, DocumentYear, ProjectCurrencyAmount, ProjectCurrencyReference, and InvoiceTax Amount.
Reporting API permissions The View Reporting APIs permission (Suite Administration > Roles and permissions > Permissions > Explore) has been replaced by product-level API permissions allowing more granular control of access to data across the organization. All existing roles must be updated accordingly.
New API – The Explore_Core_User API reports the same fields as the SelfService_Core_User API but only reports records that are currently active.
SelfService_Plan_Timecard and Explore_Plan_Timecard APIs – The following new fields were added to these APIs:
WorkOrderId
WorkOrderDisplayId
EquipmentRepairedId
EquipmentRepairedDisplay
EquipmentRepairedDescription
LaborCostTypeId
LaborCostTypeName
LaborCostCenterTypeDisplay
EquipmentCostTypeId
EquipmentCostTypeName
EquipmentCostTypeDisplay
OverriddenLaborCostTypeId
OverriddenLaborCostTypeName
OverriddenLaborCostCenterTypeDisplay
OverriddenEquipmentCostTypeId
OverriddenEquipmentCostTypeName
OverriddenEquipmentCostTypeDisplay
Approver1Id
Approver1FullName
ApproverRole1Id
Approver1RoleName
Approver2Id
Approver2FullName
ApproverRole2Id
Approver2RoleName
ExecutorId
Executor1FullName
ExecutorRoleId
Executor1RoleName
ClientApproverName
SentToPayrollById
SentToPayrollByFullName
SentToPayrollDate
ConfirmationRecievedDate
IsAdditionalPayrollInstructionCodeOverriden
EmployeeBillingClassId
EmployeeUDF1
DailyPlanName
TimeCardStatusId
CreatedById
DailyPlanShiftId
TempEmployeeId
TempEquipmentId
SourceSystemId
EmployeeBillingClassName
EmployeeBillingClassDescription
EquipmentBillingClassId
EquipmentBillingClassName
EquipmentBillingClassDescription
SelfService_Plan_QuantityClaim API – The ProjectId field has been added to this API.
Updated 15-NOV-2022
Deprecation of the SelfService_Control_CostItemActual API Due to architectural changes made in the Control application, the SelfService_Control_CostItemActual API will be deprecated this release. The API will still exist in this release, but no data will flow through it. Refer to "Control Actuals Reporting" for detailed information. The following new APIs will be replacing the existing API:
SelfService_Control_ActualQuantity
SelfService_Control_ActualManhours
SelfService_Control_ActualCost
SelfService_Control_ActualsVendorHour
Data type change in Explore_Plan_WorkPackaging API – As a result of changes made in the Work Packaging page with the ability to tag a section as Started, the data type will be an integer that coincides with the status of the section for the following fields:
EnvironmentalComplete
SafetyComplete
QualityComplete
GoalsComplete
LaborComplete
TemporaryStructuresComplete
ToolsComplete
QualityFormComplete
LessonsLearnedComplete
ConstraintsComplete
MaterialsComplete
EquipmentComplete
SchedulesComplete
ComponentsComplete
BudgetsComplete
WorkSequencesComplete
The columns can now be populated with the values 0 (Draft), 1 (Completed), or 2 (Started). In Release 22.10, a new API will be available to populate the text of the status to its integer value.
New APIs – The following SelfService APIs have been added:
SelfService_Contract_CostItemPricingCategory – This API shows the cost categories as they are shown in the Cost Item Pricing feature.
SelfService_Contract_CostItemPricingResourceCategoryCost - This API shows the cost at the resource level from the Cost Item Pricing feature.
SelfService_Contract_CostItemPricingResource – This API shows the Resources assigned in the Cost Item Pricing feature.
SelfService_Control_ActualVendorHours - This API shows Actual Vendor hours from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualQuantity – This API shows Actual Quantities from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualManhours – This API shows Actual Manhours from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualCost – This API shows Actual Cost from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Core_Market This API shows the data as entered in the Market section of the project Details page.
SelfService_Core_ProjectMarket – This API shows markets and the project associated with them.
SelfService_Core_Union – This API shows the data from Master data libraries > Unions.
SelfService_Core_RevenueCategory – This API shows the data from Master data libraries > Revenue Categories.
SelfService_Core_Qualification – This API shows data from Master data libraries > Qualification.
SelfService_Core_PaymentTerms – This API shows data from Master data libraries > Payment terms.
SelfService_Core_Material – This API shows data from Master data libraries > Operational resources > Material.
SelfService_Core_MeasurementType – This API shows the data from Master data libraries > Units of measure > Measurement types.
SelfService_Core_Incoterms – This API shows data from Master data libraries > Incoterms.
SelfService_Core_GeneralLedgerAccount – This API shows data from Master data libraries > General ledger accounts.
SelfService_Core_Discipline – This API shows data from Master data libraries > Disciplines and commodities > Disciplines.
SelfService_Core_ContactType – This API shows data from Master data libraries > Cost centers> Contact types.
SelfService_Core_Contact – This API shows data from Master data libraries > Contacts > Contacts.
SelfService_Core_Commodity – This API shows data from Master data libraries > Disciplines and commodities > Commodities.
Updated API – The Notes field on the project Details page has been added to the SelfService_Core_Project API.
Change issue dashboard – This dashboard now contains details about vendors and aging. The dashboard has also been reformatted to allow for more dynamic navigation between tabs and enhanced filtering.
Updated 15-NOV-2022
Deprecation of the SelfService_Control_CostItemActual API in Release 22.8 – Due to architectural changes made in the Control application, the SelfService_Control_CostItemActual API will be deprecated. The API will still exist, but no data will flow through it. The following new APIs will be replacing the existing API, and additional information will be provided in the 22.8 release notes.
SelfService_Control_ActualQuantity
SelfService_Control_ActualManhours
SelfService_Control_ActualCost
SelfService_Control_ActualsVendorHour
New APIs – The following SelfService APIs have been added:
SelfService_Core_EmployeeCertification – This API exposes the data from Operational Resources > Edit Employee > Certifications.
SelfService_Core_Vendor – This API exposes the data from Master data libraries > Vendors > Vendors.
SelfService_Core_AccountCodeCharacteristicTypeList – This API exposes the values assigned to account code tags and can be used with the SelfService_Control_AccountCodeCharacteristic API.
SelfService_Contract_VendorAssociatedChangeItem – This API exposes the data from Contract > Contracts > Details > Associated change items.
SelfService_Control_ForecastNote – This API exposes the notes associated to a forecast, as well as information about the forecast such as the forecast type, snapshot ID, and cost item ID.
Explore_Plan_Timecard – This API exposes the timecard data and contains the same fields as the SelfService_Plan_Timecard API, with the exception that this API only reports active records and refreshes every 20 minutes.
Updated APIs – The following SelfService APIs have been updated:
SelfService_Plan_Timecard – The refresh rate for this API has been changed to once per day due to performance degradation. If you need to receive the 20-minute refresh interval, you must use the new Explore_Plan_Timecard API.
SelfService_Contract_LineItem – When there are multiple WBS phase codes associated to a line item, the WBSPhaseCode field must be separated by pipes (||) instead of a comma.
Explore_Contract_AccrualDetail – Three new fields have been added to the API, ContractDetailId, LineItemCode, and CostItemId. When there are multiple cost items per accrual detail record, the CostItemId field must be separated by pipes (||).
SelfService_Contract_IssueSummary – The CostItemId field has been added to the API. When there are multiple cost items per accrual detail record, the CostItemId field must be separated by pipes (||).
SelfService_Contract_VCOLineItemDetail – Two new fields, CostItemID and LineItemDescription, have been added to the API.
InEight Control dashboard – A new dashboard has been added for Control that lets you perform analysis on your account codes, CBS items, pay items, cost categories and more. The visualizations on this dashboard have been designed to draw attention to where action needs to be taken.
Read more
Updated 22-JUN-2022
New APIs – The following SelfService APIs have been added:
SelfService_Plan_DailyPlanResourceDetailBillingClass – This API exposes the billing classes as assigned to resources on a daily plan.
SelfService_Core_VendorType – This API contains the data for vendor types that is in Master data libraries > Vendors > Vendor types.
SelfService_Core_AccountCodeImportLog – This API reports the data from the Account Code Import Log that is in Master data libraries > Account codes > Import log.
SelfService_Core_AccountCodeCharacteristicTypeList – This API exposes the Account Code tags as defined at the organization level.
Explore_Plan_Timecard – (Available in 22.4.2 minor release.) This API exposes the timecard data and contains the same fields as the SelfService_Plan_Timecard API, with the exception that this API only reports active records and refreshes every 20 minutes.
Updated API – (Available in 22.4.2 minor release.) The refresh rate for the SelfService_Plan_Timecard API has been changed to once per day due to performance degradation. If you need to receive the 20-minute refresh interval, you must use the new Explore_Plan_Timecard API.
InEight Estimate dashboard – Powered by the data in Estimate (SaaS), this new dashboard lets you look at upcoming bids, recent bid results, and trending information on bids won versus bids submitted.
APIs – The following additions and changes were made to SelfService APIs:
User roles – A new API, Explore_Core_ProjectUserRole, allows you to map users in your organization to the roles assigned to them.
Roles and permissions – A new API, Explore_Core_RoleAction, allows you to map roles to the actions or permissions assigned to them.
Contract sync log – A new API, SelfService_Contract_SyncLog, exposes data from the sync log grid when navigating to Contract > Contracts > Sync Log.
Contract line item – Added the CostItemId field to SelfService_Contract_LineItem.
Timecard – Added OverriddenCraftId and OverridenCraftDescription fields to SelfService_Plan_Timecard.
Workpackage – Added PlatformName, NeededQuantity, AvailableQuantity, and ExternalURL fields to SelfService_Plan_WorkPackageComponent.
API documentation – The Reporting API documentation has been moved from within the InEight cloud platform to the InEight Knowledge Library. In the Main menu, Explore > API Documentation is now a link to the Knowledge Library Explore Resources tab, where the SelfService APIs are organized by their respective product.
Updated 28-FEB-2022
APIs – The following additions and changes were made to SelfService APIs:
Master data – These new APIs, SelfService_Core_Trade, SelfService_Core_Craft, SelfService_Core_EquipmentCategory, and SelfService_Core_EquipmentType expose the Master data lists for equipment and employees in InEight Platform.
InEight Control audit log – A new API, SelfService_Control_AuditLogImportHistoryRegister allows you to view import history across projects and identify any upload issues that is shown in Control Workspaces > Audit Log > Import history.
InEight Contract accruals – These new APIs, Explore_Contract_Accrual and Explore_Contract_AccrualDetail expose data from Contract that is shown in Contract > Contracts > Accruals/Receipts.
CBS audit log – These fields were added to the SelfService_Control_CBSAuditLog API: ProjectId, ChangedById, TotalPriceBefore, TotalPriceAfter, CostItemId, PrevValueId, NewValueId, AccountCodeId, AuditType, ParentAuditId, and EstimateResourceId.
APIs – The following APIs were added: Explore_Plan_WorkPlanCostItem, Explore_Plan_WorkPlanEquipmentDetails, Explore_Plan_WorkPlanLaborDetails, Explore_Plan_WorkPlanLessonsLearned, Explore_Plan_WorkPlanRisk, and Explore_Plan_WorkPlanSequence.
APIs – The following additions and changes were made to SelfService APIs:
Account code characteristics – The new SelfService_Control_AccountCodeCharacteristic API exposes Account code tags and User defined fields.
Project-level attributes – The new SelfService_Core_ProjectDetailAttributes API exposes data in [Project] > Project details > Attributes.
Organization level attributes – The new SelfService_Core_OrganizationAttributeDefinitions API exposes data in [Organization] > Settings > Attribute Definitions.
HideinPlanandProgress – This new field was added to the SelfService_Control_CostItemDetail API.
Prime Contract and Project Contacts – These fields were added to the SelfService_Core_Project API.
Compliance Scheduled Tasks – Due to data integrity issues, deleted scheduled tasks and scheduled tasks with no default responses will be filtered out of the SelfService_Compliance_EventTaskData API.
Operational resources – The new SelfService_Core_OperationalResourceEmployee and SelfService_Core_OperationalResourceEquipment APIs expose the Master data list of operational resources for your organization.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Explore.
Dashboard management – A new Explore settings page was added that lets administrators hide dashboards at the organization level, control the dashboard refresh schedule, and initiate a dashboard refresh on-demand.
Read more
Daily plan hours APIs – APIs for daily plan hours have been deprecated due to insufficient performance and complications in creating primary keys based on how the daily plan hours records are stored.
Read more
API permissions – Permissions for Explore APIs were previously based on your project level access. In this release, access to APIs is only available through an InEight Platform permission that is assigned to your role. As an administrator, you can assign this permission by going to Suite administration > Roles and permissions > [User] > Permissions > Explore, and then selecting View reporting APIs.
Navigation – The InEight cloud platform common navigation used in Explore was enhanced for ease of use. For more details, refer to InEight Platform release notes.
Norwegian – Explore is available in the Norwegian (Bokmål) language.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Explore.
Deprecated APIs – In the 21.5 release, these APIs for daily plan hours will be deprecated due to insufficient performance: SelfService_Plan_DailyPlanHours, SelfService_Plan_DailyPlanHoursResource, SelfService_Plan_DailyPlanHoursResourceDetail, SelfService_Plan_DailyPlanHoursPayrollIndicators.
(See 21.5 release notes for more information.)
In this release, no features were added but technical improvements were made in the background to enhance your experience in Explore.
Portfolio dashboard – This dashboard leverages data from multiple InEight applications to help you understand how your projects are progressing and to identify areas that might need attention sooner rather than later.
Read more.
Advanced Work Packaging dashboard – This dashboard exposes the valuable data captured by the Advanced Work Packaging module and lets you track the work from planning to completion.
Read more.
Core Project Information dashboard – This new dashboard shows information about your projects, users, and product usage, which is maintained in InEight Platform.
Read more.
Explore mobile – The Explore mobile app allows users to access and view Explore dashboards on-the-go from any mobile device.
In the 20.7 release, no features were added but technical improvements were made behind the scenes to enhance your experience in Explore.
Sharing embedded content – More functionality was added to embedded external content in Explore that lets you share the content with others in your organization, just like you can share edited dashboards.
Read more.
Contract dashboard – Now you can access the Contract dashboard in Explore and launch it directly from the Contract application, instead of having to switch between applications.
Read more.
Updated 05-JUN-2020
API documentation – The self-service API documents are now available for you to view within the application, making it easy to find information to include in your dashboards.
Read more.
Dashboard collaboration – Enhancements were added that allow you to share dashboards and edit the same dashboard instead of having to save a copy to edit it.
Read more.
Embedded external content – Create external dashboards in Power BI or Tableau, and then expose them in InEight Explore to make Explore your single source for dashboard reporting.
Read more.
Updated 07-APR-2020
Manhour Curves dashboard – This new dashboard matches what is in InEight Report and allows you to edit and customize the reports to match your business processes.
Read more.
Contract dashboard – A comprehensive contract dashboard was added that allows you to follow your contracts throughout their lifecycle and drive action where it is needed.
Read more.
Control Audit dashboard – Use this new dashboard to track and view what changes were made in the Control application.
Read more.
Material Tracking dashboard – The Material Tracking dashboard lets you view visibility to see components that do not have materials associated with them and where materials are for work plans that are not ready.
Read more.
Last data refresh – The Last Modified date in Explore was replaced with the last data refresh date to indicate the last time the data was refreshed for that specific dashboard.
Read more.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information