Launch Model

After Model is installed, you can launch Model from the InEight cloud platform landing page when integrated with Platform or using the Model shortcut in your Windows Start menu or the shortcut created on your desktop for Model (Legacy).

Model has online and offline capabilities, which can be changed on the login screen and within the application. The best practice is to sign in online to ensure your local cache data is up to date with the latest project information, and then use Model offline when needed.

Launch Model (Integrated with Platform)

Launch Model (integrated with Platform)

  1. On the Project home page, select Model from the list of applications in the menu, and then click Open VEO_WebLaucher in the Open VEO_WEbLauncher dialog box.

  2. In the Model login dialog box, you can sign in using your SSO information provided in the email.

  3. Select a project from the Load Project dialog box.

    The Load Project dialog box shows Model projects created in Platform.

Considerations

  • To access Model, you must be set as an active user with applicable Model permissions in InEight Platform.

  • The project must be enabled for Model in the project’s Global Option’s Product integrations section to show in the Load Project list.

Launch Model (Legacy)

In Model (Legacy) you can create projects, user accounts, assign permissions, and assign users to projects. When you create a new user, the user receives an email with login information.

Launch Model (not integrated with Platform)

  1. Click the Model icon on your desktop or select Model from the Windows Start menu.

  2. At the login screen, enter the login information provided in the email. You can also sign in using single-sign-on (SSO).

  3. In the Load Project dialog box, select a Model project from the list.

    The Load Project dialog box shows only the projects that you are assigned to.

Considerations

You must have administrative permissions.