viewer interface

The Viewer interface (Workspace) is highly configurable. Tools and panels are accessed through a series of menus located across the top of the application and a notification panel located across the bottom of the application.

Panels can be opened, closed, rearranged, and docked into various configurations. Move, dock and un-dock panels by dragging the panel title bar.

Hold Ctrl before dragging a panel to prevent it from docking automatically.

  • Some Panels have multiple areas, differentiated with tabs:
  • When panels are docked on top of one another, each panel is represented as a tab
  • Tabs can be on top, side of, and bottom of a panel
  • Select the tab to activate a specific panel or area of a panel
  • The active panel tab is highlighted in orange
  • Re-size undocked panels by clicking and dragging the panel edge
  • Resize a docked panel by clicking and dragging the edge of the panel

Docking Panels:

  • While moving a panel to dock at the Top, Bottom, Left or Right, the Viewer will respond by indicating a space for the panel to be docked

  • Panels can be docked at the Top, Bottom, Right, and Left of the viewer

  • Panels can be docked on top of one another

  • Panels can be docked at the top or bottom of another panel

  • Panels can be docked beside another panel

  • Panels can be docked in between two panels

  • Panels can be stand alone on the same or different monitor