Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

The Viewer interface (Workspace) is highly configurable. Tools and panels are accessed through a series of menus located across the top of the application and a notification panel located across the bottom of the application.
Panels can be opened, closed, rearranged, and docked into various configurations. Move, dock and un-dock panels by dragging the panel title bar.
Hold Ctrl before dragging a panel to prevent it from docking automatically.
While moving a panel to dock at the Top, Bottom, Left or Right, the Viewer will respond by indicating a space for the panel to be docked
Panels can be docked at the Top, Bottom, Right, and Left of the viewer
Panels can be docked on top of one another
Panels can be docked at the top or bottom of another panel
Panels can be docked beside another panel
Panels can be docked in between two panels
Panels can be stand alone on the same or different monitor
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information