General release is available starting 09-DEC-2024.
(Release 25.1) Daily Plan Review report - In Release 25.1, the Vendor summary section will be renamed to Daily Summary, and the WBS column in the section will be deleted.
Buyout Review subscription – In the Buyout Review report, the Custom Field 1 parameter has been updated to show the Package Custom Field 1 values, instead of Contract custom values. Any views used by subscriptions for this report must be updated. Update your subscriptions by going to the My Views page, and then save the selection for the Custom Field 1 parameter, even if your previous selection was Select All.
Engineering Summary report – A new report for InEight Design shows scope items with associated manhours and percent complete values. This report also includes options to group the report output into primary and secondary groupings.
Buyout Review – Columns in the Buyout Review report have been renamed and reordered. The Tax column (column F) has been renamed as Original Scope Tax and is now column G. The Original Scope Vendor Change Order column is now column F. The Tax column (column K1) has been renamed as Contract Tax and is now column L1. Column K1 has been removed.
Summary Report by Two Groups – The colors in row groups have been updated to match the latest InEight branding standards.
Crew Performance – A new parameter has been added that lets you select CBS Position as a secondary grouping option, instead of the default secondary grouping by WBS.
Daily Plan Summary – A new Productivity section has been added to show data from the Daily Planning > Productivity tab and is an option that can be selected in the Sections parameter.
Subcontract Line Item SOV – A new column has been added to the SOV grouping that indicates when the SOV item is available in InEight Contract. Formatting has been updated to show a strikethrough in the report to match unavailable SOVs in the Contract UI.
Plan Activity – The new parameter, Include in Schedule, has been added with two options:
Only include in schedule: Only shows data for Plan Components with the toggle Do not schedule set to False.
All: Shows data for all Plan Components regardless of the Do not schedule toggle setting.
Vendor Change Order Log – The new parameter, Discipline, has been added that lets you select disciplines associated with a bid package.