In the Engineering module, cause codes are required when a quantity change occurs. The list of available cause codes are configured at the organization level in Settings > Design > Engineering > Cause codes. Cause codes configured at the organization level are available to all projects.
To add a new cause code, enter an ID and a description, and then click the Add Cause code icon.
To edit cause codes, click in the fields, and then enter text. To delete a cause code, click the Delete cause code icon to the right. To adjust the position of a cause code in the list, select the cause code, and then click the up or down arrows to the right of the table.
You must have the permission Edit engineering settings.
For more information about updating scope item quantity, see Update scope item quantities and Update scope item quantity by import.