There are multiple ways to generate transmittals using InEight Document, depending on your requirements.
You are also prompted to create a transmittal each time you upload documents in bulk.
Create a transmittal from the Documents register to transmit document links to recipients.
From the Documents register, select the documents you want to transmit.
Enter the transmittal details.
If you add recipients who are not set up as users, and the project requires each person to sign in to access documents, a warning is shown.
You can click the Add icon in the documents section to add additional documents if needed.
If you want to add a stamp to the view file, click Stamp document PDF view file.
If you want the recipients to be able to view or download files with their annotations, select the Include comments check box. If the check box is not selected, the transmittal does not show the option to download with annotations.
If you want the annotations to be automatically downloaded when the recipient downloads the transmittal, click Force recipients to download with annotations.
What's next: The transmittal is shown in the Transmittals Sent items register. If the transmittal is large, and processing takes place in the background, a processing icon shows to the left of the item in the register. When processing is complete, a check mark icon shows. If the process was unsuccessful, an exclamation point shows.
You are also given the option to transmit documents after you upload them.
Recipients receive transmittals via their nominated email account. Documents can be downloaded individually from the links on the transmittal. Recipients can also choose to download the documents in bulk.
When you download a document from a transmittal, a prompt to download a later revision will appear if a later revision has been uploaded.
If all the documents on a transmittal are in PDF format, these can be merged into a single PDF file for download by ticking the Merge PDF files option.
Recipients can automatically be notified about future transmittals of revised documents by selecting Notify on revision at the top of the Details page.
To link items to a transmittal, click the Links tab.
To generate a preview of the transmittal before sending, click Print Preview.
It is possible to send confidential transmittals where only the sender and recipient(s) can view the transmittal. This must be enabled by InEight. If enabled, users will be able to select the Send Transmittal as Confidential option when composing the transmittal.