Sectioning lets you isolate a certain section or area of a project to easily visualize model content. Adjust the Sectioning box in the 3D viewer by managing the Top, Bottom, Left, Right, Front, and/or Back planes of the box.
When the mouse cursor moves through the Sectioning panel a yellow outline is shown along with a corresponding yellow line in the 3D view indicating the current edge of the section.
To access the Sectioning panel, select View from the menu bar at the top of the screen. Then, select Sectioning.
This opens the Sectioning Panel.
Toggle OFF to ON to initiate a section box. Toggle HIDE to SHOW to see the section box in the 3D View.
Sectioning can also be switched ON or OFF with a left mouse click on the Section icon located at the bottom left of the screen. Switch SHOW/HIDE, and launch the Sectioning Panel with a right click on the icon.
Additional Information