A model that is published (imported) into InEight Model is referred to as a Model stream, whether they are exported from a design application or imported from a design file type using plugin tools.
When models are published the following Tag Names are created:
InEight_Object_Total_Surface_Area
InEight_Object_Volume
Each plugin tool has standard tags that are included in every published model as shown in the following tables:
| Tag category | Tag value |
|---|---|
| Model Stream | <model name> |
| Tag_Level | <level names> |
| Tag_PhysicalType | Window, Floor, Door, etc. |
|
Revit_Family_Type |
<Family Instance names> |
| Revit_Function | <Walls and Floors> |
| Material Name - CAD | <face material names> |
| Tag category | Tag value |
|---|---|
| Model Stream | <model name> |
| ACAD Block | <block names> |
| ACAD Layer | <layer names> |
|
ACAD Material |
<material names> |
| Tag category | Tag value |
|---|---|
| Model Stream | <model name> |
| IFC Class | <IFC class names> |
| IFC Layer | <IFC layer names> |
|
IFC Material |
<IFC material names> |
| IFC Name | <IFC name names> |