Imports and exports

A convenient way to create items, such as bid packages, contracts, and line items, is through importing. You can also export items to an Excel spreadsheet, so you can edit lines quickly or analyze data using outside tools.

Import data

The import template lets you import data into the register. The template is a Microsoft Excel spreadsheet with columns to import that correspond to columns on the register.

The first worksheet contains the Instructions for the template, where the legend and guidelines are located. The guidelines describe the information on the Import template, exporting with data and how to update or add more information to the existing data.

The second worksheet, Data, is where you enter your data for the import. The columns are color coded to indicate which columns are system generated, required data, optional data and ignored data. 

A screenshot of a cell phone

Description automatically generated

When using the template, keep in mind the following:

  • The names of the tabs must not be changed.
  • Column names in the Data sheet must not be changed.
  • Columns must not be removed or rearranged.

Importing the Template

From the register, select the Import icon to begin the downloading.

The Import data from template opens for you to import and save the template or for you to drop a completed template to be uploaded. The template is updated frequently, and it is best practice to download a new template each time you want to import any template.

After the template has been downloaded, you complete the required areas. Do not change the name of the spreadsheet tabs.

After you have completed the information in the template, you can import it into Contract.

Import data from a template

Summary: Import data from a template when you want to add items in bulk.

Considerations: These steps assume that the Microsoft Excel template has been downloaded and completed according to the template instructions. Because the available fields and their functionality are frequently updated, it is best practice to download a new template each time you want to import data.

Quick steps:

  1. From the Import data from template window, drag and drop or browse to your template file.

  2. If the Import dialog box has a field that lets you indicate calculations, such as whether to update milestones based on duration or dates, select the applicable option.

  3. Click Import.

After you have imported your Excel file, you can correct any errors in the Import history window.  After you import, the new data shows in the register.

Contract validates the date format based on the person who imports the data. If the date format does not match the preferences of that person, Contract generates an error in the import history and removes the date.

Export a template with data

From the register, select the Export icon, and then select With data.

A screenshot of a cell phone

Description automatically generated

In the exported file, you can use the Data worksheet to update the applicable fields before importing it.