Disciplines

You can define disciplines to associate with resource types and claiming schemes in the Engineering module. Examples of disciplines are architectural, civil, or drainage.

You can manage the disciplines for your organization in Settings > Design > Engineering > Disciplines.

Steps

You can do any of the following actions:

  • Add – Enter an ID and Description, and then click the Add discipline icon.

  • Edit - Click in the fields, and then enter text.

  • Remove - Click the Remove discipline icon to the right. You cannot remove a discipline assigned to a resource type or a claiming scheme.

  • Sort - Select a discipline, and then click the up and down arrows to the right of the table to adjust the position of the discipline.

When disciplines are created, they become available to add in resource types and claiming schemes for projects in the organization. For more information, see Resource types in project settings and Claiming schemes overview.

Considerations

  • You must have Level 3 – Account Admin permissions in InEight Platform or a role with the applicable permissions in Engineering.

  • Disciplines must be added to create resource types.