Lesson 32 Review

  1. Which InEight Estimate form is used to enter basic information about the job as well as define our cost basis?

    1. Pay Item & Proposal

    2. Job Properties

    3. Library

    4. Job Folder

  2. All default data and settings copy from the Library into your new job folder except:

    1. Labor rates

    2. Equipment rates

    3. Material rates

    4. All of the above

  3. These are considered the “building blocks” of the job – you employ them to cost items to develop your estimate.

    1. Assemblies

    2. Pay Items

    3. Resources

    4. Forms

Lesson 32 Summary

As a result of this lesson, you can:

  • Explain the estimating process in InEight Estimate

  • Explain key terms and concepts