In this exercise, you will practice using the Trench Calculator to take-off piping and bedding materials. Complete the following steps:
In the Training Job, create a new cost item called Underground Pipe.
Give the cost item a quantity and unit of measure of 1640 Linear Feet.
Open the new cost item and open the Trench Calculator.
On the Trench tab, enter the variables for the trench:
|
Trench length |
1000 feet |
|---|---|
|
Trench width (at bottom) |
4 feet |
|
Trench depth |
10 feet |
|
Hinge elevation |
5 feet |
|
Backslope |
45 degrees |
|
Material swell/shrinkage factor |
0.10 (decimal) |
Select the MPR36 material resource from the drop-down Results list.
On the Beddings tab, enter bedding variables.
|
Bedding lift 1 |
|
|---|---|
|
Elevation (from trench floor) |
6 inches |
|
Additional material needed to compensate for compaction |
5.00% |
|
Conversions factor (Ton per CY) |
1.3 |
|
Bedding material resource (Tons) |
MASAND |
|
Bedding lift 2 |
|
|---|---|
|
Elevation (from trench floor) |
38 inches |
|
Additional material needed to compensate for compaction |
5.00% |
|
Conversions factor (Ton per CY) |
1.1 |
|
Bedding material resource (Tons) |
MAFA |
|
Bedding lift 3 |
|
|---|---|
|
Elevation (from trench floor) |
76 inches |
|
Additional material needed to compensate for compaction |
5.00% |
|
Conversions factor (Ton per CY) |
1.1 |
|
Bedding material resource (Tons) |
MACA1-1/2 |
Select OK and confirm that the pipe material and bedding materials populated the cost item.
You should end up with the following results
Congratulations, you have completed this exercise!