Lesson 32 Review

  1. The Haul calculator allows you to:

    1. Calculate the number of trucks required to complete the haul in a set amount of time

    2. Calculate how long it will take to complete the haul with a set number of trucks

    3. Neither

    4. Both

  2. The Trench Calculator allows you to quickly calculate ___________ values.

    1. Trench

    2. Pipe

    3. Bedding

    4. All of the above

  3. For the in-field calculator, what symbol needs to be at the beginning of the math equation for it to calculate?

    1. +

    2. =

    3. (

Lesson 32 Summary

As a result of this lesson, you can:

  • Use the Haul Calculator

  • Use the Trench Calculator

  • Use the In-Field Calculator