System Settings Options
From the Backstage View, you can access system settings. System settings contain options and settings that effect the entire InEight Estimate system. These settings include:
-
General settings (options)
-
Title Bars
-
Navigation Bar
-
Job Startup
-
Language
All of the settings under the Options branch are user-level settings.
The following step by step walks you through configuring general settings (options).
Step by Step — Decimal Precision
-
With InEight Estimate open, click on the File tab to go to the Backstage view.
-
Select Settings.
-
Select General under Options in the node tree on the left.
-
To activate Prompt to Save, select the Prompt to Save checkbox.
-
Select how often you want to be prompted (in minutes).
-
Select Decimal Precision in the tree on the left.
-
Review the default settings.
Units of Measure will default to English, and Currency will default to U.S. Dollar.