The subtotal feature is for situations where the Owner wanted subtotals on the proposal form of pay item groups.
The following screen shot is using the supplied Subtotal register view:
From the Subtotal column, the last item in the subtotal group is where the box is checked. Once the box is checked, then a description may be entered. After the box is checked, the Subtotal Amount and Running Subtotal Amounts are then displayed in a bold font.
In our standard Proposal Report, there is an option to printout the subtotals.