Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

The version of the Primavera Integration API application that is required for Primavera to interact with Estimate depends on the version of the Primavera database server that you have installed. You must install the same version of all Primavera components. For example, if you installed version 8.1 of the P6 EPPM database server, you are required to install version 8.1 of the P6 EPPM Integration API.
The installation files for this application can be found on your Primavera installation media.
Use the following step-by-step at the server console where the Estimate Primavera Integration Server will be installed.
Locate and start the setup.exe file on your installation media for the Primavera Integration API.
If you get the Media Pack from the Oracle e-delivery website, you will find the Integration API in the Web Services download.
On the Welcome to the Primavera Integration API Installer screen, click Next to continue.
If prompted on the Software License screen, select I Agree. Click Next to continue.
On the Installation Type screen, select Local Mode Packages Only. Click Next to continue.
Browse to the location of where you want to install the Primavera Integration API.
On the Select Components screen, select both Demo Applications and Integration API Javadoc.
If prompted, specify the location of the JRE or JDK file that you installed. Click Next to continue.
Example JRE Java.exe file location: C:\Program Files\Java\jre6\bin\java.exe
Example JDK folder location: C:\Program Files\Java\jdk1.6.0_23
Click Next and then Install to continue the installation.
On the Database Configuration screen, select either Oracle or Microsoft SQL as appropriate. Click Next to continue.
In the User Name field, enter the Primavera database user name pubuser.
In the Password field, enter the Primavera database password pubuser.
In the Database Name field, enter the Primavera database name pmdb or pmdb$primavera.
For Oracle, enter the SID name XE.
In the Database Host Address field, enter the IP address or DNS name of the server where the Primavera database resides.
In the Database Port field, enter the port number you documented in the TCP IP Port Number topic.
Click Next to continue.
If you have an existing Primavera database configuration, you can select the existing configuration or create a new one. Click Next to continue.
Click Exit to complete the Primavera Integration API installation.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information