On the cost item record’s Notes data block, you can enter any cost item-specific notes that provide instructions, parameters, or explanations such as in the following examples:
For a Hauling cost item — There should be very little waste. If so, we can spread it out in the right of way at MP 111
For a Structural Excavation and Backfill item — The backfill cannot be the native material. Must use clean base rock
For an Underground Pipe cost item — The average depth is close to 10 ft.
You can also use the Notes data block to reference cost item changes (e.g., changing shift arrangements, changing a resource rate).