General release is available starting 07-OCT-2024.
Updated 09-OCT-2024
Estimate and InEight Schedule integration - You can now select InEight Schedule as your integrated schedule in Estimate. Read more
Notes field for estimates - A new Notes field has been added to the Estimate job properties page to add additional estimate related information. Read more
Copy foundation setup data from a template - You can now copy updated foundation setup data such as account codes, tags, work breakdown structures, and work group tags from a template job to your estimate. The Copy data from another Job action includes jobs marked as Is Template. Read more
Add projects permission extended beyond root level - The Add projects permission has been extended to level 1 and level 2 role users for root and sub-organizations. Now, you can create your own projects in Platform. Read more
Updated Data Version and new Upgrade Required columns in the Job Register - The column labeled Version has been updated to Data Version to help identify the data version of the job, and a new Upgrade Required column has been added to identify whether an upgrade is required for the job. Read more
Release 24.11 Estimate API deprecated fields – In Release 24.11, location, city, state, country, latitude, longitude, forecast start, forecast finish, and duration fields will be deprecated in the Estimate API and will no longer be available to provide data. Read more
General release is available starting 05-AUG-2024.
Updated 15-JULY-2024
Performance improvements – Performance modifications have been made to the back end services to improve the performance and resiliency of the system.
General release is available starting 03-JUN-2024.
Edit Filter button –When creating or modifying filters in registers, the Filter Editor can now be invoked by clicking the Edit Filter button located on the bottom right of the page.Read more
New job and template register OBS filter tree – The Job register now has an organization tree filter so you can see where estimates exist in the OBS.Read more
New subtotal row in registers – You can now select multiple rows in a register and see the total amount of the rows at the bottom of the register.Read more
Edit Job Register Data – You can now modify Job Register attributes in the Estimate Library for non-upgraded jobs. Read more
Cost Item Assembly Object Input Values – The object input type has been added to the Inputs section of the Cost Item Assembly (CIA) record Inputs form. This saves you the time of updating and maintaining lists of resources from job to job.Read more
Using Object Type Inputs – In the CIA record Calculations form, Object Type inputs can be used in formulas by directly referencing either the Code or the Description as attributes of the input variable. These two new fields can be easily referenced and selected using the Formula Editor. Read more
ObjectValue function –The ObjectValue function can now be selected in the Formula Editor, which lets you utilize additional object meta data for use in your calculations.
Read more
Assign Templates – You can now assign templates to specific organizational nodes in the OBS.
Read more
Editable Quantity Ratio Field - The Quantity Ratio column in the Resource Employment register, which indicates the proportion between the quantity of a cost item and the quantity of the resource employment, is now an editable field.
Read more
Watch video
Quantity Ratio Units – The new Quantity Ratio Units field shows you how the Quantity Ratio is calculated. Read more
Access Control Report - You can now export the Access Control register as a report, so you can easily audit multiple assignments and determine the level of access that users and roles have.
Read more
Model integration - The current Model to Estimate on-premise integration now works with Estimate in the cloud.
Read more
Merge and Upload Contacts and Vendors into Platform – You can now manage disconnected vendors and contacts by merging them with existing InEight Platform vendors and contacts or uploading them to create new Platform vendors and contacts. This helps your company transition to leveraging a consolidated approach for managing your subcontractors and suppliers across all InEight applications while retaining all the information you built over the years in Estimate Address Book, including where those people and companies have been referenced and used in estimates, quotes and RFQs.Read more
New Quantity Ratio column – A new Quantity Ratio column has been added to the Resource Employment register, which indicates the proportion between the quantity of a cost item and the quantity of the resource employment. This new column is helpful if you want to quickly look through your resource employments to see if you have the correct ratios. Read more
Watch video
New Quote Comparison and Award Microsoft Excel file –The Microsoft Excel file generated when you export the Quote Comparison & Award form now more closely resembles the form in Estimate, so users of this output can more clearly understand what the estimators knew when they made determinations on which numbers to carry.
Read more
Cost Item Assembly text input values – You can now add a new third option of Input Type of text in the Inputs section of the cost item assembly record. Read more
Watch video
Performance improvements – Performance modifications have been made to the back end services to improve the performance and resiliency of the system.35
The release of Estimate in the cloud focuses on enhancing InEight Estimate integrations with InEight Platform. As InEight continues delivering enhancements in upcoming releases, there will be an increased spotlight on incorporating data shared among all InEight products in Platform. In this release, you can now associate your estimates with additional master data, such as project data from the Project details page in Platform.
Associating Platform projects lets you organize estimates directly from Platform’s Organizational Breakdown Structure (OBS). Your location assignment in the OBS determines the access you inherit and the visibility you have to other areas of the OBS.
You can also apply role-based security and permissions already established and maintained in Platform and adopt a more efficient management of multiple estimate versions, which are all affiliated to a single platform project.
Job Register Management – Another advantage of associating Estimate with Platform project data is the capacity to manage multiple versions of Estimates from one source project. Read more
Security roles, permissions, and user management – Platform’s role-based security lets you specify access to jobs in Estimate and can now be managed using the OBS. Read more
Merge Cost Items – You can now merge selected cost items together in the CBS, which helps to simplify the structure of an estimate. Read more
Watch video
Job Created by and Source Job fields in Job Properties – The Job Created by and Source Job fields now update with current data for copied jobs. Read more
Auto-include Jobs in Connected Analytics/Datawarehouse – When you create a new job, you can now choose to auto-update the job in Connected Analytics. You no longer need to manually select the Connected Analytics option to auto-update it. Read more
Estimate Dashboard Calendar View –The Estimate Dashboard now includes a calendar view tab that shows a list of upcoming project bids by month, week, day, or list view. Read more
Schedule Cost Risk Export –You can now generate an InEight Schedule Cost Risk Excel file that allows you to import it into Schedule Cost Risk view and produce risk adjusted estimates. Read more
Print preview window is non-modal – The Reports print previews now opens in its own tab in the Report Dialog. Read more
Print preview ribbon – The Print Preview menu is now displayed on its own ribbon. Read more
Cover Sheet fields and Job folder tags can be used in report headers and footers – In addition to the existing job code and job description tags in Job Properties, you can now use the Cover Sheet fields and Job Folder tags for your headers and footers in all standard reports. Read more
Apply custom Layouts and Headers/Footers to register reports –You can now apply custom Layouts and header/footers to register based reports. Read more
Additional options available in the Standard Proposal Report –The Position Code is now an optional field to display on the Standard Proposal report, giving you additional flexibility in determining which key fields to include, such as the pay item number column. Read more
Additional cost item tags and new user defined fields in the Quote Record register –The tag fields in the Quote Record registers Cost items tab increased from 10 to 25. 15 new User Defined fields are now added to help you to sort, filter, and group on selected quote records more efficiently. Read more
Resource Employment register’s additional user defined fields –The Cost Item User Defined fields in the Resource Employment register increased from 10 to 15. Read more
Source System Name field added to the Resource Rate register –A new column called Source System Name has been added to the Resource Rate register to better understand the source of the data when integrating with other systems. Read more
Estimate is now available as a hosted solution on the InEight cloud Platform – In addition to the existing on-premise (client/server) Estimate software product, InEight now offers the Estimate in the cloud product for new customers, which focuses on a software licensing and delivery model that is subscription based and centrally hosted. Read more
Estimate in Project Suite - Accessing the Estimate application in the InEight cloud platform first requires authentication in InEight Platform. Read more
Automatic Updates - When you are ready to connect to the Estimate application, a detection is made to check if you have the latest version of the client application installed. Read more
User Roles and Access Control - This functions differently but with a similar purpose in Estimate in the cloud. In Estimate in the cloud, roles are no longer created using Windows Active Directory users. Read more
Access Control - For users authorized to launch Estimate in the cloud, permissions can be granted for application specific commands, destinations and register. Read more
Integration with InEight Explore - Estimate in the cloud can now integrate with Explore, a connected construction data analytics solution offering construction project dashboards that provide deep, interactive analysis across the entire suite of applications with custom visualizations, metrics, and KPIs.
Estimate dashboard - Estimate dashboard puts critical information on bids and opportunities in one place enabling estimators to gain better visibility into the bids they have upcoming, helping them better manage their time and finish estimates when needed. Read more
Self-Service APIs - Explore provides a collection of self-service API’s and associated documentation for accessing your data from data compliant reporting solutions, such as Power BI or Excel. Read more
This release of InEight Estimate largely focuses on improvements and more flexibility around the bid pricing functionality, which enhances an estimator's ability to effectively price out various types of bid proposals.
The new pay item hierarchy in the Pay Item and Proposal register allows for grouping of pay items. This helps estimators to more closely match pay items to the bid items provided by the owner. The new pay item price categories give better visibility into how prices are established and provide a breakdown of the prices at the level required for more detailed bid forms. In addition, visibility is provided into the man-hour at a pay Item level. These new features collectively let you more efficiently fill out an owner's bid form and accurately provide the required detailed information.
Improvements such as assigning indirect cost to pay items, including business overhead as markup and selectively marking up pay items provide estimators more flexibility in how markup is spread throughout the Bid allowing them to effectively price their work.
Estimators now have an improved way to track competitive bid information directly in the Competitors tab. In this new register, you can now keep track of submitted bids, as well as record and track bid prices on the individual bid items.
Other improvements to enhance your Estimate experience include an automatic refresh of the Pay Item & Proposal register, the ability to establish pay item prices using billing rates, support for having multiple bond or rate table based dependent items in the CBS, and a new CBS tree navigation mode letting you quickly navigate to a cost item record using the CBS tree hierarchy.
User interaction improvements include a new common navigation slide-out panel which is shared amongst all InEight products, plus, shift rate calculator and production tab window layout improvements.
Pay item hierarchy –Many Bid Forms are organized by grouping bid items for related scopes of work. Pay items in the Pay Item and Proposal page can now be grouped in a hierarchy by utilizing the Position Code column. Read more
Watch video
Pay item prices by category – Owners are increasingly requiring more and more information from contractors as part of their bid submissions. This often requires the further breakdown of bid prices by indicating prices by category such as labor cost, material cost or man-hours. Read more
Assign indirect cost to pay items – The cost segment field in the CBS is used to differentiate estimated costs in the Direct Costs, Job Overhead or Business overhead categories. Read more
Watch video
Categorize business overhead as markup – In previous versions of Estimate, Business overhead is considered an indirect cost and contributes to the total cost of a project. Now estimators can choose if costs with a cost segment of business overhead should be considered as indirect costs or markup. Read more
Watch video
Selective pay item markup – Estimate makes it easy to estimate the cost of a project and price the work to ensure all unassigned costs and markup are included in the final price of the project. Read more
Bid pricing using billing rates – For Cost Reimbursable or time and expense type projects it might be necessary to produce a bid proposal based on the billing rates used in the estimate. Read more
Watch video
Bid tabulations – Estimators need a way to track competitive bid information for which the Competitors tab is utilized.
Automatic refresh of Pay Item & Proposal register – Often, you must continuously adjust certain pay items, which then rebalance to hit your target goal. The Pay Item and Proposal register now automatically refreshes when a change is made, which triggers updates to a job’s price. Read more
Bond rate dependent cost item improvements – For certain projects, it might be desirable to calculate costs for bond or insurance premiums based upon multiple different rate tables. As such, it is now possible to add multiple bond and rate table based dependent items in the CBS. Read more
CBS tree navigation mode – The CBS Tree filter shows the CBS hierarchy and is used to help to quickly filter cost items, instead of scrolling the CBS to locate certain cost items. Read more
Improvements to WBS quantity roll-up – The Quantity Roll-Up feature lets you roll up and derive at the parent item’s quantity from detailed level takeoff quantities, while eliminating the need to manually calculate these roll-up values. Read more
MS Project export – If your project’s schedule is integrated with MS Project, you can now export a copy of your MS Project file. Read more
Common Navigation – Access the common navigation slide-out panel by selecting the main menu located on the top left side of the Estimate page. Read more
Shift rate calculator – The Shift Rate Calculator window has been improved to show the work shift days, hours and scales in more of a spreadsheet grid-like style. Read more
Production tab – The Production Rate tab in the Cost Item Details window has been improved to show the duration and quantity driven resource columns, in more of a spreadsheet grid-like style. Read more
This release of InEight Estimate focuses on improving the workflow and efficiency of many features. A new feature, Quantity Roll-up, was added that lets you to quickly roll up quantities for cost items and WBS items, which improves workflow and removes redundancy. The new Resource Employment register provides a flat list of all employments allowing you to easily make updates. Other improvements include the upgraded find panel in register and records grids that enhance search results. Improvements such as retaining productivity rates and showing productivity drivers in the CBS register will improve your ability to analyze your estimate.
Estimate help content has also been upgraded to a web-based help system. The web-based help content includes a better search function as well as an upgraded user interface, which makes finding the content you need a much easier experience.
Other enhancements were made that improve your Estimate experience, including the Bid Wizard, Bond Table functionality, and a new filtered view to identify unquoted items in the Quote Compare & Award register.
Quantity Roll-Up – The Quantity Roll-Up feature lets you roll up and derive at the parent item’s quantity from detailed level takeoff quantities, while eliminating the need to manually calculate these roll-up values. The parent item’s quantity is calculated by calculating the contributing subordinate cost items/employments quantities based on the Quantity Roll-Up codes. This ensures the parent item’s quantities are automatically updated when the contributing subordinate cost items/employments quantities are updated. Read more
Resource Employment register and record – The Resource Employment register and Resource Employment record have been added to let you easily work with all resource employments for an estimate without the need to filter the CBS register down to specific employments. Read more
Improved Find functionality – The improved Find feature now lets you search across all columns with a single operation. Read more
RFQ improvements – When sending out requests for quotes (RFQ) on a bid, it is essential to be able to effectively communicate the project requirements to potential subcontractors or suppliers to ensure you have good quote coverage within your estimate. Read more
InEight Estimate spreadsheet option – Estimate now supports the option to use a spreadsheet control for those that do not have the on-premise version of Microsoft Excel installed. Read more
Web-based help content – To improve the usefulness of the help topic content, the Estimate help content has migrated from an in-product help file to a more modern web-based help content. Read more
Store productivity rates – Estimate now retains the productivity rates for a cost item when its quantity is set to zero. Read more
Productivity rate indicator in the CBS register – To easily understand which productivity rate is your driver in the CBS register, a productivity indicator displays which field contains the as-entered value and is driving the estimate for that cost item. Read more
Viewing items without quotes – In the Quote Compare & Award register, new quote item toggles have been added to the View subsection. Read more
Bid Wizard enhancements – The ability to filter, search and select data in the Bid Wizard has been improved. While using the Bid Wizard, the Include option is now left unchecked by default. Read more
Deleting bond tables – A delete bond table button has been added to the Bond Tables page that allows you to delete bond tables that are out of date. Read more
Editable man-hour factors in suspended cost items – With this enhancement you can now edit man-hour factors for a suspended cost item. Read more
Employment details included when swapping resources – When swapping resources, you have the option to select the new Use Default Employment Resources check box. Read more
Currency added to Job Tracking Excel import – Currency has been added to the Job Tracking Excel import. Read more
Nonmodal Report dialog – The Reports dialog is now nonmodal. It is docked along with the other forms. Read more
This release of InEight Estimate focuses on improving the work flow and efficiency in using various features. The improvements in the Quote Management feature will greatly improve a company’s ability to choose the right quotes. Adjustment fields will improve user efficiency as they can quickly make adjustments in the CBS register while being able to review its impact on the estimate. The Repositioning of the dependent cost items will aid in users being able to better visualize and have control on the estimate structure.
Some of the other enhancements to Estimate include, the WBS Tree control, Filter Editor and the functionality to Archive and Restore templates.
Quote Management – Managing Subcontractor and Supplier quotes during the closing hours of the bid can be challenging as much of the risk is in ensuring proper selection of the number to carry in the estimate. The Quote Management enhancements in this release focus on improving a company’s efficiency in entering quotes, aligning scopes and ensuring the selected quote minimizes risk and provides the best value.
The All Quote Groups layout would allow users to see all the quote groups at the same time and make appropriate selections based on a good understanding on how any particular quote group would impact the entire estimate. Features such as duplicating a quote to create new quotes, packing an entire quote and editing quote values in Quote Compare and Award allow users to quickly make last minute changes to the estimate. In addition, features have been added to provide better visibility and flexibility in aligning scopes and being able to perform an efficient comparison of various quotes. Read more
Adjust Cost Items from CBS Register – In this release, Estimate now provides the ability to quickly make Total Cost and Billing Adjustments for a scope of work without being required to specify various cost categories, especially in the closing hours of the Bid. The total adjustments can now be made in the CBS register and can be viewed either from the Standard view of the CBS register or a saved view affiliated with change. Read more
Reposition Dependent Cost Items – With this new release, you now have the option to reposition the location of dependent cost items, making the buildup of costs more logical and easier to review in an estimate. Repositioning dependent cost items creates a simpler way to manage the hierarchy of your project by placing items of more importance ahead of other line items. Read more
Filter Editor – The new Filter Editor displays conditions as a tree branching system, making it easier for users to create and maintain complex register filters. With each Condition or Group you add, the more branches you add to the filter. Read more
WBS Tree filter mode – Similar to the CBS Tree, the WBS Tree has been added to the Work Breakdown Structure View register. Read more
Archive/Restore templates – The templates feature has now been enhanced to provide users the ability to Archive and Restore templates so they are portable. Read more
This release of InEight Estimate greatly improves the layout and operation of the Quote Management system including the Quote Compare and Award form. In addition to quote management improvements, Sub-Assemblies were added to the Cost Item Assemblies form. Other enhancements to Estimate include navigation and filtering as well as many other improvements.
Quote Management – Quote Management has a new look and feel designed for tracking the information you need. The Quote Management system improves visibility into how multiple quotes affect the estimate, while also increasing your efficiency in selecting the quote that provides your estimate with the best value. Read more
Cost Item Assemblies – The Cost Item Assemblies form is improved to provide you with more manageable features, such as the new Sub-Assembly feature which allows cost item assemblies to be used in other cost item assemblies. Read more
User experience – The user experience in this release includes improved register filtering, new customizable features for the ribbon navigation, and the expand/collapse function for the Cost Category tree. Read more
Split by Cost Type – It is common for an estimate to progress through multiple levels of detail. Often a high-level estimate for a particular scope of work consists of a single cost item inclusive of the entire cost of that work in a single line item. Read more
Work Breakdown Structure – The Work Breakdown Structure (WBS) allows you to easily reorganize the estimate using different formats such as Construction Specifications Institute (CSI) MasterFormat or UniFormat. Read more
Estimate job templates – Job Templates provides you the ability to maintain a list of template jobs that can be used to create new jobs. Read more
Other improvements – This release provides many improvements to current features including Archive/Restore, Snapshots, and many more. Read more