Model 24.11 Release Notes

VIDEO | 24.11 Release Overview

General release is available starting 09-DEC-2024.

Updated 21-NOV-2024

Desktop Release Notes

  • Point cloud data support – You can now import, visualize, and manipulate point cloud data in Model. Support for point cloud data enables a more streamlined workflow for projects that incorporate 3D scanning or LiDAR data. ClosedRead more

    Support for point cloud model data enhances Model’s tools for design visualization, engineering, and any workflow that requires precise real-world data integration. You can validate design data before and after construction, capture real-time visualization, and have timely issue recognition.

    You can easily perform the following:

    • Align and overlay point clouds with existing 3D models.

    • Create accurate meshes.

    • Refine real-world scans to enhance your designs.

    • Capture precise measurements directly from your point cloud data, ensuring accuracy.

    • Analyze and validate real-work dimensions in your project, such as measuring distances, angles, or volumes.

    The following images show some point data model functions in Model.

    • Measuring and sectioning:

    • Grayscale and RGB color comparison:

    • Dot sizing:

    For more infomration, see the new Point cloud data topic.

Mobile Release Notes

  • In this release, no features were added but technical improvements were made in the background to enhance your experience in Model Mobile.

Admin Tools Release Notes

  • In this release, no features were added but technical improvements were made in the background to enhance your experience in Admin Tools.

Microsoft Excel Plug-in Release Notes

  • In this release, no features were added but technical improvements were made in the background to enhance your experience in Microsoft Excel Plug-in.