Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
General release is available starting 09-DEC-2024.
Unlocked equipment columns – Validation for several equipment columns now show in the timecard fields. As a result, the columns have been unlocked, and you can move them from the selected columns list back to the available columns to remove them from the grid. Previously the columns could not be moved and were locked because of where the validation errors were displayed.
Read more
Clear local database on iPads – You can now clear or refresh the local database from the app settings without having to uninstall and reinstall the application. This is used to clear out data for the entire application or on a single daily plan. Local, un-synced, changes are not restored.
Auto-Include for components – You can now pull components into a daily plan as tasks are selected. When you have a single component on a WBS or task, which has been previously used in Progress, adding the same WBS on a plan auto selects the component.
Upload photo attachment sync – When syncing data, failed photo uploads due to connection issues no longer result in a failed sync. The number of photos to be uploaded from the iPad/iPhone shows near the sync icon.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information