Review 

  1. Which of the following is how can you identify a terminal cost item on the CBS register page? (Select all that apply.)

    1. The row is highlighted a different color

    2. A symbol displays on certain cost item fields

    3. The row is indented

    4. The ‘Is Terminal’ column is checked

  2. When moving a cost item to be above another cost item at the same level, which icon should display when you drag and drop the cost item?

    1. The one with a subordinate bar

    2. The one with three equal bars

    3. The one with an equal sign

    4. The one with a plus sign

  3. If you make changes to your spreadsheet, you must _____ the spreadsheet prior to importing it into Control.

    1. close

    2. copy

    3. save

    4. refresh

Summary 

As a result of this lesson, you can:

  • Explain the Cost Breakdown Structure and its purpose

  • Create, arrange and delete cost items

  • Import cost items