You can use features in Control to track schedule dates at a CBS level. The ability to easily add and modify this information allows you to accurately track your operations planned and completed dates.
The schedule data can either be mass imported through a Microsoft Excel upload, created and modified directly within the CBS, or by way of Primavera schedule integration through and XER file import.