In this video, we'll walk through the basic navigation of the Completions Mobile app. As a contractor., today, you're assigned to inspect the Electrical splicing boxes installations, and wiring in the TFP location of Tower 2of the power plant's generator. And with the mobile app on your iPad in the field, you can stay on top of the progress of your project at all times.
Log in and you'll see the multiple projects, depending upon your access. Select your project, open the Control menu. Based on your permission level, you'll be able to access the modules assigned to you within InEight Completions project. Prior to owner acceptance, a variety of commissioning, or CX activities, steps and sign-offs need to occur.
Each step, or phase, is customizable per project to fit whatever workflow is required. Your Project Administrator will create the CX items, the phases, and their sequence, so that you can work through your assigned phase, completing the required components. While Inspections can be created and assigned in advance, additional flexibility allows for standalone inspections to be created on the fly, just when you need it. While completing an Inspection, you'll be able to access the Checklist and required Elements previously created by your Project Admin that are included in this inspection.
Within a specific checklist, you'll address each item and create any issues you may identify along the way. You can also add attachments to document your findings, and add comments as needed too. After the inspection is done, you'll update the status of the inspection. In this video, you've walked through the high-level process of accessing the Completions mobile app, and in the selected project completed an inspection while interacting with other modules such as checklists, issues, documentation, and comments.
We'll explore additional functionality and specifics of each module in subsequent videos.