Progress 26.1.2 Release Notes
Duplicate Sign-Out Survey Records – An issue in the reject and resubmit workflow previously allowed duplicate records to be created from the progress daily plan. This has been resolved to make sure only one valid record is created per employee.
Progress 26.1 Release Notes
General release is available starting 02-MAR-2026.
Task employee intersection – When you select a task employee intersection that has the reason code configuration enabled, it now shows both the short code and the full description for billing class and rate code fields. This feature helps you determine that you are selecting the correct option, like the mobile app.
General release is available starting 29-DEC-2025.
Reason codes on existing daily plans – Users with Level 3 roles in Progress can now turn Time Center reason codes On or Off in the project settings. Previously, this option was locked when a daily plan was created. Changing this setting does not affect historical data. If reason codes are enabled, only new or updated hours will show detailed reason code information in Time Center.
Improved component association in Progress daily plan – You can no longer associate the same component multiple times to a WBS value or task. This change addresses an issue caused by the Filter label components toggle not working as intended in previous releases.
General release is available starting 27-OCT-2025.
Photo attachment update for notes – You can now attach up to 20 photos at once. As you select photos, a counter shows how many you have left. Also, you can edit, share, download, or delete from the same dialog box. Instead of only previewing the first attachment, all photos now show in a grid, making it easy to see everything in one place.
Read more
General release is available starting 27-OCT-2025.
Photo attachment update for notes – You can now attach up to 20 photos at once. As you select photos, a counter shows how many you have left. Also, you can edit, share, download, or delete from the same dialog box. Instead of only previewing the first attachment, all photos now show in a grid, making it easy to see everything in one place.
Read more
General release is available starting 25-AUG-2025.
Logic update in allowance management – You can now edit allowances in a plan when in Awaiting approval status. Previously, to edit allowances, it was required that the plan be rejected and then resubmitted.
Time sheet QR Code scanning – You can now scan QR codes to look up resources in a time sheet. Scanning QR codes lets you find employee information quickly. Previously, you had to manually enter the employee data.
Read more
General release is available starting 23-JUN-2025.
Rate code and Billing class status – Rate codes and billing class fields now support the Available and Unavailable statuses from InEight Platform, so you can undo changes to billing classes and rate codes in a daily plan without requiring any major changes.
Read more
Calendar updates in Time Center – The Date selection drop-down list shows new fixed options by days that do not depend on a fiscal calendar permission. Previously, the Weekly and Monthly labels were dependent on specific permissions.
General release is available starting 21-APR-2025.
Improvements to the UI – The look and feel of existing features have been updated, which includes a new two-part calendar that combines date and time selections into a single widget for improved usability. Additionally, the Notes tab now features an updated photos section for better organization and visibility.
Update to Daily Plan approval flow – To prevent having to make adjustments to quantities because of approvals made on future dated plans, adjustments to the Daily Plan approval process have been made to restrict future dated plans with claiming from being approved.
To improve the readability, enhancements were made to the Quantity tab to show text related fields on the left side of the screen and number related fields on the right side of the screen.
General release is available starting 17-FEB-2025.
Updated notes tab on iPad – The layout of the Notes section on the iPad has been updated to be consistent with the layout of the iPhone. Improvements include a new photo count that lists how many photos are in a plan so you can easily see the photo limit. There is also a new swipe to delete option, and the control options have been moved to the upper right corner to be consistent with the other sections in the app.
Read more
Updates to Settings Interface on iPad – The Settings Interface was enhanced to match the app’s new color scheme and to also match the iPhone settings slide-out panel.
Read more
Clear local database on iPads – You can now clear or refresh the local database from the app settings without having to uninstall and reinstall the application. This is used to clear out data for the entire application or on a single daily plan. Local, un-synced, changes are not restored.
Auto-Include for components – You can now pull components into a daily plan as tasks are selected. When you have a single component on a WBS or task, which has been previously used in Progress, adding the same WBS on a plan auto selects the component.
Upload photo attachment sync – When syncing data, failed photo uploads due to connection issues no longer result in a failed sync. The number of photos to be uploaded from the iPad/iPhone shows near the sync icon.
Updated 08-OCT-2024
Job title column – A new Job title column has been added to the Time Center grid that lets you filter project employees by job title. For more information, see Time Center Navigation.
Copy break and shift details – When copying break and shifts, the resource hours are now copied to the break and shift details in the new plan. For more information, see Daily Plan from Copy.
iPad UI updates – The iPad app has been updated to match the latest iPhone app interface for a more consistent experience. Changes to colors and screen alignments were made, but functionality remains the same.
Quantity tab alignment on iPad – To improve the readability, enhancements were made to the Quantity tab to show text related fields on the left side of the screen and number related fields on the right side of the screen.
General release is available starting 05-AUG-2024.
Updated 05-AUG-2024
Export Time Card history – The Export time cards option in Time Center now shows a new history page.
Read more
Left side navigation – The Navigation bar was moved from the top of the screen to the left side on the Progress iPad app to match the iPhone interface.
Read more
Copy multiples – The ability to copy multiple days for a Daily plan was added to the mobile iPhone and iPad apps to match the capabilities of Progress web.
Hour validation – Hour validation was added to the sign-in and sign out screens for both iPhone and iPad mobile apps.
Read more
General release is available starting 03-JUN-2024.
Updated 03-JUN-2024
Bulk Plan approval– Plans that are in theAwaiting Approvalstatus can now be approved or rejected in bulk.
Read more
Employee name column filtering– The employee column in Time Center now lets you filter an employee’s first or last name. Previously you could only filter by both first and last name.
Update reason code– A new setting was added to the project settings to update reason code for sent time cards.
Read more
View by status– A new filter was added to the Plan list screen that lets you filter by the daily plan status.
Task visibility from daily plans (iPad)– There is now a new a date range filter in the Productivity tab. This filter lets you see productivity results for the tasks on the current daily plan.
Additional break options– Employees and crew now have additional fourth and fifth break options to accommodate longer shifts. Previously, there was only an option for three breaks. For more information, seeInput Actuals
Time Center
Specific time entry – Hours can now be tracked with two places after the decimal and are no longer restricted to the quarter-hour. To enable specific time entry, the Enforce 15 minute time entry setting in the Progress organization settings must be set to off . This change will facilitate time entry down to the minute. For more information, see Organizational settings.
In Progress category in the Time Center side panel – A new In Progress category was added to the side panel in Time Center. Previously the not sent category included time cards that were not sent along with those in the processing status. The new category can help you to quickly determine which time cards need to be posted to your external payroll solution. For more information, see Time Center Navigation
Multi select enabled – You can now select multiple items in Time Center by holding the Shift key while making a group selection. Previously, the only options were individual selections or select all.
Remove shared queries – You can now remove shared queries. When granted level 2 or 3 permission and the Removed shared queries permission is enabled, a user can unshare a shared query, removing from the shared list for all users. For more information, see Time Center Navigation.
Mobile iPhone UI updates – The mobile app has been updated to better support the latest iPhone hardware.
General release is available starting 03-JUN-2024.
Updated 03-JUN-2024
Bulk Plan approval– Plans that are in theAwaiting Approvalstatus can now be approved or rejected in bulk.
Read more
Employee name column filtering– The employee column in Time Center now lets you filter an employee’s first or last name. Previously you could only filter by both first and last name.
Update reason code– A new setting was added to the project settings to update reason code for sent time cards.
Read more
View by status– A new filter was added to the Plan list screen that lets you filter by the daily plan status.
Task visibility from daily plans (iPad)– There is now a new a date range filter in the Productivity tab. This filter lets you see productivity results for the tasks on the current daily plan.
Additional break options– Employees and crew now have additional fourth and fifth break options to accommodate longer shifts. Previously, there was only an option for three breaks. For more information, seeInput Actuals
Specific time entry– Hours can now be tracked with two places after the decimal and are no longer restricted to the quarter-hour. To enable specific time entry, the Enforce 15 minute time entry setting in the Progress organization settings must be set to off . This change will facilitate time entry down to the minute. For more information, seeOrganizational settings.
In Progress category in the Time Center side panel– A new In Progress category was added to the side panel in Time Center. Previously the not sent category included time cards that were not sent along with those in the processing status. The new category can help you to quickly determine which time cards need to be posted to your external payroll solution. For more information, seeTime Center Navigation
Multi select enabled– You can now select multiple items in Time Center by holding the Shift key while making a group selection. Previously, the only options were individual selections or select all.
Remove shared queries– You can now remove shared queries. When granted level 2 or 3 permission and the Removed shared queries permission is enabled, a user can unshare a shared query, removing from the shared list for all users. For more information, seeTime Center Navigation.
Mobile iPhone UI updates– The mobile app has been updated to better support the latest iPhone hardware.
Updated 15-Feb-2024
Increased hour validation – The Flag hours as exception on the employee review screen when they are above this value setting is now used to highlight employees when more than expected hours are included in the specific daily plan. For more information, see "Organization settings"
Show all Employee hours – The Daily Plan review has been updated to show all employee hours. The Daily Plan Review now shows all data for any projects the logged-in user has access to allowing for review across multiple projects. For more information, see Employee Register
Disabled PIN Sign Out – If a PIN has not been configured for an employee, the option to enter a PIN at sign-out is now disabled, and a signature is required. For more information, see Input Actuals
View plans for all projects – A drop-down option was added to view Plans for All Projects. The View plans for all projects option lets you review multiple projects in Daily Plan Review. For more information, see Employee Register
Images posted to Document gallery (Web only) – Photos attached to daily plans are now visible in the Document application (if configured) and in the existing sources.
Default allowances – You can configure an employee so that allowances are automatically associated when added to a daily plan. This is done through the Project assigned Payroll indicators.
Operational work order entry – For reason code-based projects, you can now enter a custom work order with time collection. This data is made available to Time Center through external APIs.
Contract data filtered – When you view the contract data in Progress only values with the same vendor associated with the account are shown.
Override billing class/project rate code – Override billing class and project rate codes are now incorporated into the Progress iPhone application. For more information, see Daily Plan from Scratch
Face ID supported for sign-in and sign-out – New Face ID biometrics for sign-in and sign-out have been added when available on iPad and iPhone hardware. For more information, see Input Actuals
Copy planned quantities – When making a copy of a plan with planned quantities, the planned values now are copied if the components are selected. Previously, this feature was only available on the web and it is now included in the iPad or iPhone app. For more information, see Daily Plan from Copy
Ability to send field issues before plan approval – iPad now supports publishing a field issue logged in the app before daily plan approval. Previously, this feature was only available on the web.
Shared Views – Views can now be shared with users and roles. Role recipients require Time Center access. For more information, see Time Center Navigation
Default allowances – You can configure an employee so that allowances are automatically associated when added to a daily plan. This is done through the Project assigned Payroll indicators.
Added fields to query builder – The Created by and Project display fields have been added to the query builder.
Operational work order entry – For reason code-based projects, you can now enter a custom work order with time collection in the Time sheet tab. You can create and edit this information through Daily Plan and Time Center and it's been added to the Progress external APIs.
Predefined date ranges update – The predefined date range values have been revised to use the organization fiscal calendar weekend day for week-based ranges.
Weekly time sheet access – Weekly time sheet access has been moved to the account level from the project level. This move better reflects the cross-project functionality of the application. Users must have a role assigned with organizational permissions; an existing default role mapped to the organization is acceptable.
Hours without Cost code – A new option was added in the organization settings to control whether users are allowed to save hours without selecting the task in the Weekly time sheet first. For more information, see Organization settings
Updated 17-Jan-2024
Time configuration settings – Time Center was updated to provide more visibility at the account and project levels. New toggles were added under the Daily Planning settings to Display Employee and Equipment Billing Class and to Enable Time Center.
Filter approver – The Approver and Executor columns in Daily Plan can now be filtered.
Payroll indicator data – The Allowance, Employee premiums, and Attendance types payroll indicator must now be created in Master data libraries and are no longer available in Progress. To configure payroll indicators in a project, go to Project Settings > Assigned payroll indicators. When the Auto Opt-In is enabled (set to true), every employee is eligible for allowance. When the field is disabled (set to false) you must add specific employees for allowance and define allowance values. For Release 23.10 employees will need to be associated to the allowance through the Plan UnionPayrollIndiator API. The Status field is not utilized in this release.
Daily Planning
Send issues to Change – You can now send an issue to Ineight Change before the daily plan is approved which lets you access issues earlier. Previously, any issues created in the Daily Plan would be sent when the plan was approved.
Link External URLs – You can now upload external URL links when attaching files. For more information, see Attachments on the Web
Copy planned quantities – Planned quantities now copy over when copying daily plans. For more information, see Daily Plan from Copy
Time center calendar range – You now have the option to select a custom date range or from a predefined calendar with a list of values based on business processes. For more information, see Time Center Navigation
Multiple billing classes – (mobile) You can now have multiple rate codes and Billing classes on a single Daily Plan without overriding the current billing class.
Weekly Time sheet
Comma separator – You can now enter a comma as a separator in place of the default period for the Labor and Equipment columns.
Global Time Center
Segment columns – Unique budget code segments are now visible in Time Center, so you can view budget codes with their supporting segment.
Read more
Weekly Time sheet
Improved notes functionality– Notes originating in the Weekly Time Sheet or Global Time Center can now be edited. Photo previews have also been improved to display larger and allow downloads.
Read more
Allowed blank tasks– Weekly time sheet allows blank tasks when submitting hours. Previously a task needed to be specified before saving.
Time Center
Time center move– Time Center has moved to the account level as Global Time Center. You must have access to the account to view or load the Global Time Center.
Improved notes functionality– Notes originating in the Weekly Time Sheet or Global Time Center can now be edited. Photo previews have also been improved to display larger and allow downloads.
Daily Planning
Sign in all– (web and mobile)You can now sign in all employees at one time.
Read more
Vendor assigned user– (web and mobile) When assigned to a vendor the list of tasks is now filtered depending on the assigned vendor.
Daily planning
Attachment checkbox (web and mobile – compatible with all web versions)-Attachments can now be copied into future daily plans.
Read more
Daily planning
WP resources association (web and mobile – compatible with all web versions)-You can now access associated work packages when adding resources in time sheets.
Read more
Equipment review(web and mobile – compatible with all web versions)- The daily plan review now has a cleaner UI. When you click on employees or equipment, you can view all resources used.
Read more
Break time updates (web and mobile – compatible with all web versions) – You can add break times for the entire crew instead of just an individual employee at a time.
Read more
Apply hours to multiple employees (web only) – You can now apply hours to multiple employees on the web. This feature matches mobile functionality.
Read more
Remove unused tasks and resources (web and mobile – compatible with all web versions) – You can remove all unused tasks or resources from a daily plan at the same time.
Read more
Shift hours (web only) – Total shift hours are shown for employees in the Sign In/Sign Out tab.
Time center:
Employee user defined field – A new Employee UDF 1 text field has been added. By default, its value is set to the value in InEight Platform. You can override the default value in Time center.
Some Progress mobile 22.8 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Daily planning:
Break time updates (web and mobile – compatible with all web versions) – You can add break times for the entire crew instead of just an individual employee at a time.
Read more
Remove unused tasks and resources (mobile and web – compatible with all web versions) – You can remove all unused tasks or resources from a daily plan at the same time.
Read more
Daily planning:
Copy premiums with a plan (web and mobile - compatible with all web versions) – You can now copy premiums when you copy a daily plan.
Read more
Associate vendor to a daily plan (web and mobile - compatible with all web versions) – You can associate a vendor to a daily plan.
Read more Watch video
Vendor associations in daily plan notes (web and mobile - compatible with all web versions) – Notes entered by vendors are automatically associated so that reporting separates vendor comments.
Read more
Break time intervals (web and mobile) – Break times can now be entered using intervals of five minutes.
Some Progress mobile 22.6 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Daily planning:
Copy premiums with a plan (mobile and web – compatible with all web versions) – You can now copy premiums when you copy a daily plan.
Read more
Associate vendor to a daily plan (mobile and web – compatible with all web versions) – You can associate a vendor to a daily plan.
Read more Watch video
Vendor associations in daily plan notes (mobile and web – compatible with all web versions) – Notes entered by vendors are automatically associated so that reporting separates vendor comments.
Read more
Break time intervals (mobile and web) – Break times can now be entered using intervals of five minutes.
Daily planning:
Issues on Quantities tab (web only) – Issues are now shown with notes on the Quantities tab of a daily plan for associated components.
Read more
Phase colors (web only) – The colors of daily plan phases have been changed to be more distinctive to match the colors in the mobile application.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Progress.
Daily planning:
Default shift start and end times (web and mobile – compatible with web version 22.2) – You can set default shift start and finish times per project.
Read more
Notes date (web and mobile – compatible with web version 22.2) – Notes now show the date they are added to a daily plan.
Updated 15-FEB-2022
Daily planning:
Default shift start and end times (web and mobile – compatible with web version 22.2) – If default shift start and end times are configured for your project, they are now shown automatically in the Sign In/Sign Out tab.
Notes date (web and mobile – compatible with web version 22.2) – Notes now show the date they are added to a daily plan.
Phase colors (mobile only) – The colors of daily plan phases have been changed to be more distinctive.
Read more
Updated 28-JAN-2022
Daily planning:
InEight Document attachments in Management console (web only) – You can attach files from Document in the Management console.
Read moreWatch video
Attach from Document in daily plan (web and mobile – compatible with web version 21.12) – You can attach files from Document in a daily plan.
Read more Watch video
Contract components (web and mobile – compatible with web version 21.12) – You can add contract components to a daily plan to track against InEight Contract for billing validation.
Read more
Allow as-built at non-terminal level – Cost items are now available regardless of the value of the Is terminal flag in InEight Control. This feature lets you track costs and quantities at different levels.
Read more
Increased photo limit (web and mobile – compatible with web version 21.12) – The attached photo limit has been increased from 10 to 20 per daily plan to improve user experience while preserving syncing performance.
Time center:
Performance improvements – General performance improvements have been made.
Daily planning:
Attach in daily plan (mobile only) – You can attach a PDF from inside a daily plan.
Read more
InEight Document attachments (mobile and web – compatible with web version 21.12) – You can view files attached from Document.
Read more
Contract components (mobile and web – compatible with web version 21.12) – You can add contract components to a daily plan to track against InEight Contract for billing validation.
Read more
Increased photo limit (mobile and web – compatible with web version 21.12) – The attached photo limit has been increased from 10 to 20 per daily plan to improve user experience while preserving syncing performance.
Daily planning:
Attach and open a document in daily plan (web and mobile – compatible with web version 21.10) – You can attach a PDF document to a daily plan to help visualize work for the foreman and crew.
Read more
Management console (web only) – A new page lets you manage toolbox talks for general, safety, environmental, and quality topics and also to attach files to daily plans.
Read moreWatch video
Override billing class (web and mobile – compatible with web version 21.10) – You can temporarily change the billing class of employees in a daily plan’s time sheet. This feature is useful when performing work considered an alternative to your default billing class.
Read moreWatch video
Filter completed components (web only) – You can choose to show or hide completed components when searching in the Quantities tab of a daily plan.
Read more
Time center:
Override billing class – You can change the billing class of employees. This feature is useful when performing work considered an alternative to your default billing class.
Watch video
Choose columns – You can add and remove columns.
Save and share views – You can save and share views.
Daily planning:
Open document in daily plan (mobile and web – compatible with web version 21.10) – You can open an attached PDF document in a daily plan to help visualize work for the foreman and crew.
Read more
Override billing class (mobile and web – compatible with web version 21.10) – You can temporarily change the billing class of employees in a daily plan’s time sheet. This feature is useful when performing work considered an alternative to your default billing class.
Read more
Weekly time sheet:
Supervisor approval (mobile only – compatible with web version 21.10) – As a supervisor, you can approve or reject time cards. Push notifications also remind you of approval deadlines.
Read more
Time center:
Localization – Time center supports all platform languages.
Bulk emergency send – A new option lets you resend all time cards on all projects that are in progress in case of integration failure.
Read more
Weekly time sheet:
Localization – Weekly time sheet supports all platform languages.
Week start day – The week start day is shown based on the setting under Daily planning at the organization level, instead of at the project level.
Negative hours at organization level – You can enter negative hours based on the setting under Daily planning at the organization level, instead of at the project level.
Daily plan:
Show long component names (mobile only) – The UI has been enhanced to show longer component names instead of truncating them.
Weekly time sheet:
Mobile app – A new iOS app is available for Weekly time sheet.
Read more
Daily plan:
Copy to multiple days (web only) – To save time planning, you can copy a daily plan to multiple days at the same time.
Read more
Edit with failed payroll sync (web only) – Daily plans are unlocked when a payroll sync fails, so you can fix errors and resend.
Weekly time sheet:
Supervisor approval notifications – Notifications remind you when employee and supervisor submissions are due or past due.
Norwegian (web and mobile – compatible with web version 21.5 ) – Progress is available in the Norwegian (Bokmål) language.
Common navigation (web only) – The common navigation used across all InEight cloud platform applications has been enhanced for ease of use. For more details, refer to InEight Platform release notes.
Open InEight Compliance mobile (mobile only) – You can open the Compliance app using a link in the Progress app.
Read more
Norwegian (mobile and web – compatible with web version 21.5 ) – Progress is available in the Norwegian (Bokmål) language.
Daily plan:
Sign In/Sign Out (web and mobile – compatible with web version 21.3) – The Signout tab has been redesigned as the Sign In/Sign Out tab. The new tab has three sub tabs for Sign In, Breaks, and Sign Out.
Sign In – Crews can sign into a daily plan and log any questions related to the beginning of the shift.
Read more
Breaks – Crews can enter up to three breaks per plan per person.
Read more
Sign Out – The Sign Out sub tab has all the features of the old Signout tab in addition to sign out questions.
Read more
Time center:
Time card reallocation – You can move Weekly time sheet time cards from one project to another project.
Read more
Weekly time sheet:
Supervisor approval – You can require time sheets to be approved or rejected by supervisors.
Read more
Daily plan:
Sign In/Sign Out (web and mobile – compatible with web version 21.3) – The Signout tab has been redesigned as the Sign In/Sign Out tab. The new tab has three subtabs for Sign In, Breaks, and Sign Out.
Sign In – Crews can sign into a daily plan and log any questions related to the beginning of the shift.
Read more
Breaks – Crews can enter up to three breaks per plan and per person.
Read more
Sign Out – The Sign Out subtab has all the features of the old Signout tab, in addition to sign out questions.
Read more
Daily Plan:
Project equipment dates (web and mobile - compatible with web version 21.1) – Daily plan consumes start and end dates for project equipment the same as it does for project employees. You cannot add equipment unless the plan date is within the equipment’s start and end dates.
Read more.
Employee-Equipment linking (web and mobile - compatible with web version 21.1) – You can use different labor reason codes in combination with the operate (OPT) equipment reason code for linked time cards.
Read more.
Time Center:
Project equipment dates – Time Center consumes start and end dates for project equipment the same as it does for project employees. You cannot add equipment unless the date is within the equipment’s start and end dates.
Read more.
Employee-Equipment linking – You can use different labor reason codes in combination with the operate (OPT) equipment reason code for linked time cards.
Hour type and reason code projects – Data replication logic has been updated so that the same environment can process projects using hour types and other projects with reason codes.
Consume personal date format – Your user account’s preferred date format is now used in Time Center for date fields.
Some Progress mobile 21.1 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Daily Plan:
Project equipment dates (mobile and web - compatible with web version 21.1) – Daily plan consumes start and end dates for project equipment the same as it does for project employees. You cannot add equipment unless the plan date is within its start and end dates.
Read more.
Employee-Equipment linking (mobile and web - compatible with web version 21.1) – You can use different labor reason codes in combination with the operate (OPT) equipment reason code for linked time cards.
Read more.
Hour types and Reason codes configuration (web only) – You can configure reason codes associated with hour types.
Read more.
Hour types and Reason codes display (web and mobile - compatible with web version 20.11) – You can see hour totals by hour type when using reason codes in the Time sheet, Signout, and Productivity tabs.
Read more.
Allowance summary (web only) – You can see the Allowance summary on the web. This feature was already available in the mobile application.
Read more.
Employee and equipment billing classes (web and mobile - compatible with all web versions) – You can see the billing class for employees and equipment instead of the trade, craft, or equipment description if your project is configured for billing class.
Read more.
Labor hour type – A Labor hour type column has been added to accommodate the configuration change in Daily Plan.
Read more.
Billing class – You can see the billing class for employees and equipment if your project is configured for billing class.
Task ID performance – All of the Task ID fields have had their performance improved to be more responsive when selecting a new value.
Task ID performance – All of the Task ID fields have had their performance improved to be more responsive when selecting a new value.
Some Progress mobile 20.11 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Hour types and Reason codes display (mobile and web - compatible with web version 20.11) – You can see hour totals by hour type when using reason codes in the Time sheet, Signout, and Productivity tabs.
Read more.
Employee and equipment billing classes (mobile and web - compatible with all web versions) – You can see the billing class for employees and equipment instead of the trade, craft, or equipment description if your project is configured for billing class.
Read more.
Add photos (web only - previously only available on mobile) – You can now add photos on the web to match current mobile functionality.
Read more.
Shift start and end times (web only) – You can now add when a shift starts and ends. This feature gives you an easy way to track employee breaks, which might be required in some locations.
Read more.
Signature sign-out (web only - previously only available on mobile) – You can now add a signature for sign-out on the web to match mobile functionality.
Read more.
Shift start and end times – The new shift start and end times in Daily Plan are also shown in Time Center.
Read more.
Some Progress mobile 20.7 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Implement background sync – The time it takes to switch users and sync data has been reduced.
Read more.
Some Progress mobile 20.5 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Add notes to maintenance tasks (web and mobile - compatible only with web version 20.5) – A notes field has been added to maintenance tasks, which did not previously have a place to log communication.
Read more.
Sign out all employees (web only) – You can now sign out on behalf of all employees, to save time during the sign-out process.
Read more.
Flag inactive maintenance (web and mobile - compatible only with web version 20.5) – Inactive maintenance tasks are now flagged with an icon to give you a visual indicator.
Read more.
Copy plan from inside a plan (web only) – You can now copy a plan when you have it open, instead of having to go back to the list of plans.
Read more.
Add notes – You now have a place to collect notes, so you can add clarification and communication on items, including staff and crew labor.
Read more.
Add tags to notes – For records whose source is Daily Plan, you can now tag notes so they can be grouped categorically in reports, giving you a higher level of detail in communication.
Read more.
Note notification – A notification has been added to see added and changed notes, giving you a better communication experience and saving time searching for answers.
Read more.
Show and hide left navigation pane – The left navigation pane can now be collapsed to maximize screen space.
Read more.
Add notes – A notes field has been added so you have a place to log communication against time cards and staff labor.
Read more.
Add tags to notes – For time cards whose source is Daily Plan, you can now tag notes so they can be grouped categorically in reports, giving you a higher level of detail in communication.
Read more.
Note notification – A notification has been added to see added and changed notes, giving you a better communication experience and saving time searching for answers.
Read more.
Progress mobile version 20.2 is backwards-compatible with web versions 19.11, 19.9, and 19.7.
Clear all filters (web only) – A button has been added so you can clear all filters at once. Previously, you had to individually clear filters on each row.
Read more.
Apply to selected equipment (mobile only) – You can now select a group of equipment on a daily plan and assign hours. This functionality was previously available only for employees.
Read more.
Sort alphabetically (web and mobile) – A button has been added to automatically sort resources alphabetically, with employees first and equipment second. Previously, resources were arranged in the Time sheet tab in the order in which they were assigned, or you could manually reorder the list.
Read more.
Favorite component indicator – A favorite icon has been associated with the component in the Quantities section of a Daily Plan. When selected, these components move to the top of the list, eliminating time wasted scrolling through a long list of items.
Read more.
Planned and claimed task and component indicator - An icon now appears in the Quantities tab of a daily plan when a task or component is planned or claimed. The icon surfaces against the WBS and against the component. This eliminates time wasted scrolling through a long list of tasks and components, giving you a visual indicator of what is planned and installed.
Read more.
Work Package link in Daily Plan – The IWP document generated in Plan and sent to InEight Document is now linked in an associated Daily Plan. This change makes Work Package details available to field personnel.
Read more.