General release is available starting 02-MAR-2026.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Design.
General release is available starting 29-DEC-2025.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Design.
General release is available starting 27-OCT-2025.
Improved document to scope item association functionality – You can now associate documents from InEight Document to scope items in the scope item slide-out panel, by associating them in a Microsoft Excel template and importing the associations, or using the new Auto map feature. These options give you flexibility to quickly and easily map documents to scope items.
Read more
Enable document claiming - A new Enable Document claiming project setting is now available in Engineering that leverages the relationship between scope items and documents in the InEight Document application. This functionality allows the scope managed in Design to earn automated claiming based on the associated document’s status from the document repository in Document.
Read more
General release is available starting 25-AUG-2025.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Design.
General release is available starting 23-JUN-2025.
Updated 27-JUN-2025
The UI in settings has been updated — The UI in settings for organization and project have been updated and now show an enhanced view where you can search and filter data.
Read more
Team and Assigned user planning — In the project settings for Engineering, the Resources tab options are now in the Teams tab as Resource assignments. This lets you easily access and manage both teams and resource assignments settings in one location.
Read more
Resource assignment section — In the Resource assignment section of the Teams tab, you now have the option to enable or disable organization and/or vendor teams for scope planning. The option to enable and/or disable organization and vendor planning teams gives you control on scope item visibility for team users.
Read more
Edit scope items in bulk — In the Scope Items page a new Edit scope items option has been added to edit scope items in bulk. Editing scope items in bulk saves you time by not having to do imports and exports to update multiple scope items and updating single scope items at a time.
Read more
General release is available starting 21-APR-2025.
Updated 22-APR-2025
Claiming scheme enhancements – On the Configure claiming schemes page, new columns have been added to better manage claiming schemes and quickly identify claiming, claiming scheme status, and associated scope items.
Read more
Scope item lock – You can now lock a scope item to prevent further claiming. The feature provides more control for scope items when you do not want claiming performed for selected scope items.
Read more
Planned man-hours unit rate calculation – In the InEight Control project settings for Design Engineering, you can now select to calculate planned man-hours using CB MHrs/Unit or CE MHrs/Unit from Control. The planned man-hour setting gives you flexibility to manage how planned man-hours are calculated.
Read more
General release is available starting 03-FEB-2025.
Updated 07-APR-2025
Update scope item quantity slide-out panel – When you update a scope item’s quantity, you now have the option to select Last claim date. You can also now choose to associate the quantity change to an issue in InEight Change.
Read more
General release is available starting 09-DEC-2024.
Updated 21-NOV-2024
Scope item integration with InEight Change – In Engineering, you can now integrate scope item steps to issues in Change.
Read more
Component link integration with InEight Plan – In the Quantity Forecasting Components section of the quantity item slide-out panel, you can now click the Component ID link to open the component in Plan.
Read more
Project value statuses – When the status of a project value is set to Unavailable in InEight Platform, a new yellow caution icon shows alerting you that the Project value is unavailable. The project values are now saved as Unavailable and are no longer deleted.
Read more
Claiming is disabled caution icon in the ID column – In Scope Items, the Claiming is disabled yellow caution icon that shows in the Compliance column now also shows in the ID column. The icon makes the scope item compliance issues visible when you do not have the Compliance column added to the view.
Read more
New columns in Scope Items – In Engineering, fields in the scope item slide-out panel have been added as columns in the Scope Items page. The columns let you quickly see the data without having to open the slide-out panel to view.
Read more
Observations section added to quantity items slide-out panel – In Quantity Forecasting, the new Observations section lets you view observations assigned to a quantity item.
Read more
General release is available starting 07-OCT-2024.
Updated 09-OCT-2024
Observations in Quantity forecasting – You can now capture scope changes and save them as observations on the new Observations page. Observations replace Quantity change notes.
Read more
In this release, no features were added but technical improvements were made in the background to enhance your experience in Design.
Archive flag feature for quantity items – In the project’s Quantity Forecasting module, you can now set quantity items as archived to improve the project load performance of large projects by not loading archived items.
Read more
Account code set UoM validation toggle added to project settings in engineering – In the projects Engineering settings, a Validate UoM for claiming toggle has been added to the Account code set tab to provide administrators an option to choose to validate the account code primary UOM from the master library. Contact your InEight representative for information about enabling this feature.
Read more
Updated 08-APR-2024
InEight Platform project value integration in Quantity Forecasting – The project value integration in Engineering is now available in Quantity forecasting as part of the integration with Platform’s project value master data.
Read more
New Attributes and project values and Component integration tabs – In project > Settings > Quantity Forecasting, the Fields and component integration tab has been renamed to Attributes and project values. In addition, a new tab has been added for Component integration.
Read more
Get CE MHrs/Unit manual rate column – In the project Quantity forecasting > Quantity Items > Action > Get CE MHrs/Unit option, you can now override the Current Rate or Pending control rate using a manual rate in the Manual Rate column.
Read more
InEight Control integration setting enhancement – In project settings Quantity Forecasting > General > Control integration, the Pay item and Assigned vendors attributes are now inherited when Control integration is enabled. You can view, filter, and export pay item and assigned vendor data by adding the Pay item and assigned vendors columns to the grid in Quantity forecasting > Quantity Items grid.
Read more
Associate documents – In the projects Engineering > Scope items > Actions > Associate documents page, a new Documents tab has been added to view a summary of associated documents to scope items.
Read more
Updated 15-NOV-2023
Document Types in Project Settings – In project > Settings > Engineering > Documents tab, a new Document Types option has been added to project settings. Now you can select which document types are shown from the Document register when associating documents to scope items in the Associate documents page.
Read more
Multiple Associate documents page enhancements – New updates have been made in project > Engineering > Scope items > Actions > Associate documents.
Read more
Documents section added to the Scope item slide-out panel – You can now manage document associations in the Scope item slide-out panel new Documents section.
Read more
Updated 05-OCT-2023
InEight Document integration – In Engineering, a new Documents tab has been added to project settings. In the Documents setting tab, set to On the Enable Document Integration toggle to allow integration with Document.
Read more
InEight Control integration setting – In project > Settings > Quantity Forecasting > General, a new Control Integration toggle has been added to project settings to inherit WBS attributes. When you assign a WBS to a quantity item, and the feature is enabled, the quantity item inherits the WBS Account code, Cost segment, and UoM attributes.
Read more
Configure work packages page – A new Configure work packages page now opens when configure work packages (Engineering > Scope Items > Actions > Configure work packages).
Read more
Work packages dialog box – When you open, add, or edit a work package, a new dialog box window opens in the Overview page.
Read more
Assigning work packages to a scope item has been updated - When you assign a work package to a scope item, other work package related scope items are automatically identified, and the the Total Mhrs, Claiming, and Date fields are updated.
Read more
Work package overview page – When you open, add, or edit a work package, a new overview page opens.
Read more
Engineering work package (EWP) integration with InEight Plan– You now can configure work packages, aggregate package data, and integrate with Plan.
Read more
Linked engineering work packages – Linked engineering work packages from linked projects now integrate with InEight Plan.
Read more
Account code set - Allow UoM editing – A new toggle has been added to enable UoM editing.
Read more
Data export in quantity forecasting – The data export function for exporting quantity items has been updated to support large file exports.
Read more
Forecast (TO) qty and CE MHrs integration with InEight Control – The sum of Forecast (TO) qty and the sum of CE MHrs fields now integrate with Control.
Read more
Project value integration change - Project value integrations have migrated from InEight Plan to InEight Platform. The configurable functions in Engineering and Quantity forecasting now integrate with Platform to align with other products.
Project values functionality has been added - You can now dynamically use project values from Platform.
Read more
Linked engineering projects – You can link projects to share deliverable and engineering work packages from the Engineering module to the Quantity forecasting module.
Read more
Percent step claim – A Claim qty % column has been added to scope items that automatically calculate the partial quantity you want to claim on a step.
Read more
Configure cause codes – You can now configure the list of cause codes at the organization level.
Read more
Assign resource users by type and team – You can assign resource users by type and team to quickly add many.
Read more
In this release, no features were added but technical improvements were made in the background to enhance your experience in Design.